Klima Industries

Klima Condensate Pump supplied to Montenegro

With about 622,000 people, Montenegro is a smaller national market in Europe. Its capital is Podgorica. Across Montenegro the climate is Mediterranean, and conditions are similar from place to place. Summers are hot and dry, with long spells above 30 °C, and winters are mild and wetter.

Demand for condensate pumps comes mostly from offices, shops and malls, homes and apartments as well as hospitals and clinics. Klima Industries lists 3 models in this range with full specifications below, and enquiries from Montenegro are welcome.

Capital
Podgorica
Population
622,000
Area
14,026 km²
Time zone
UTC+1, moving to UTC+2 while daylight saving applies
Climate
Mediterranean
Supply
230 V, 50 Hz
Main ports
Bar
Standards
ISME (Institute for Standardisation of Montenegro) standards and CE-aligned technical regulations

Klima Condensate Pump models

All Klima products for Montenegro · Klima Condensate Pump overview

What Montenegro demands of condensate pumps

In Montenegro, cooling demand peaks from late spring to early autumn. Outdoor units sit in direct sun, which raises component temperatures well above the air temperature; condensate pumps with generous ratings and secure terminations last longer than parts chosen to the bare nameplate value.

Changing temperatures cause condensation on cold hoses, so insulate the discharge line near the condensate pump to prevent dripping.

Montenegro supplies 230 V at 50 Hz, the common 230/400 V, 50 Hz pattern, so condensate pumps rated for 230 V single-phase and 400 V three-phase equipment are the usual choice.

Condensate pumps across the cities of Montenegro

From Pljevlja to Bar, the longest straight-line gap between listed cities is about 142 km; which keeps most road deliveries inside a day. The capital, Podgorica, is also the largest listed city (about 237,000 people), which keeps most large buyers in one place. Climate decides how condensate pumps age, and it changes from city to city in Montenegro: the last column shows what to expect.

CityPeopleClimateWhat wears condensate pumps first
Podgorica237,000Mediterraneansoftening tape and sagging fittings
Niksic58,000Mediterraneanadhesives and plastics ageing early
Herceg Novi20,000Mediterraneansoftening tape and sagging fittings
Pljevlja19,000Mediterraneansoftening tape and sagging fittings
Budva18,000Mediterraneanadhesives and plastics ageing early
Bijelo Polje15,000Mediterraneanadhesives and plastics ageing early

Every one of the 8 listed cities has a Mediterranean climate, which keeps the choice of parts consistent from city to city.

Time zone, sun and daylight in Montenegro

Local time in Podgorica is UTC+1, moving to UTC+2 while daylight saving applies.

Podgorica lies at 42.4° N, 19.3° E. Daylight lasts about 15 h 18 min at the June solstice and about 9 h 04 min in December, with a noon sun 71° and 24° high; the summer sun is high, so outdoor units in unshaded spots take strong direct heat.

Neighbouring supplies to check before ordering condensate pumps

Montenegro borders Albania, Croatia, Bosnia and Herzegovina, Serbia and Kosovo. All of them use a nominal 230 V at 50 Hz, the same as Montenegro, so an electrical rating that fits one side of the border fits the other.

Jobs in Montenegro that call for condensate pumps

Typical work in Montenegro that needs condensate pumps:

  • Ceiling cassette and ducted indoor units
  • Dehumidifier and humidifier drains
  • Condensing boilers and heat pumps
  • Basement and low-level split units
  • Commercial kitchens, bakeries and food counters

Klima condensate pumps models

ModelMax lift (m)Flow rate (L/h)Tank volume (L)
Klima Mini Condensate Pump5120.5
Klima Condensate Pump with Safety Contact7201.0
Klima Cassette Condensate Pump10402.0

See the full Klima Condensate Pump range for specifications, standards and a plain-language guide to choosing the right part.

How to pick condensate pumps for work in Montenegro

  • Choose lift to suit the vertical distance from pump to outlet plus a safety margin.
  • Pick a tank size and shape that fits the space above the false ceiling or beside the unit.
  • Confirm the supply first: Montenegro uses 230 V at 50 Hz, so check the voltage and frequency rating of condensate pumps against the equipment nameplate.
  • For Mediterranean conditions in Montenegro, favour higher temperature ratings and some margin on every rated value.

Care and maintenance in Montenegro

  • Check the non-return valve so water does not run back into the tank.

In the northern hemisphere the busiest cooling months fall from June to September; April or May is a sensible time to check condensate pumps in Montenegro. Fit accessories during the same visit to avoid a second call-out.

Faults to watch for

  • A pump that runs constantly or never runs

Standards and paperwork for condensate pumps in Montenegro

Klima condensate pumps follow IEC 60335-2-41 (pumps for liquids); in Montenegro expect ISME (Institute for Standardisation of Montenegro) standards and CE-aligned technical regulations as well. Request the datasheet and test documents with your enquiry so the paperwork is ready before the goods ship.

Supply and delivery to Montenegro

Cargo for Montenegro usually arrives through Bar; tell us your preferred port or delivery address with your enquiry.

The local currency is the Euro (EUR), so confirm the quotation currency and delivery terms before you order. The main languages are Serbian, Hungarian, Bosnian and Albanian; this site and its enquiry form are in English.

Wholesalers and installers who buy regularly can ask about trade terms. See the distributors page.

Questions about condensate pumps in Montenegro

How high can a condensate pump lift water?

Models are rated by maximum lift, commonly several metres. Choose a pump whose lift is comfortably above the actual vertical distance to the outlet.

What voltage should condensate pumps be rated for in Montenegro?

The mains supply in Montenegro is 230 V, 50 Hz. Match condensate pumps to that voltage class and confirm whether the equipment is single-phase or three-phase before you order.

Which standards apply to condensate pumps in Montenegro?

Klima condensate pumps follow IEC 60335-2-41 (pumps for liquids). In Montenegro the local framework is ISME (Institute for Standardisation of Montenegro) standards and CE-aligned technical regulations; request the datasheet and conformity documents with your enquiry.

How are condensate pumps delivered to Montenegro?

Sea freight into Montenegro normally clears through ports such as Bar, with onward delivery by road; urgent parts can travel by air.

Which cities in Montenegro can I order condensate pumps for?

Every listed city is covered. The largest are Podgorica (237,000), Niksic (58,000), Herceg Novi (20,000), Pljevlja (19,000) and Budva (18,000). The country page lists the rest.

What local time and daylight should I plan for in Montenegro?

Podgorica keeps UTC+1, moving to UTC+2 while daylight saving applies. At 42.4° N there are about 15 h 18 min of daylight in June and about 9 h 04 min in December.

Do the neighbours of Montenegro use the same mains supply?

Yes. All 5 listed neighbours (Albania, Croatia, Bosnia and Herzegovina, Serbia and Kosovo) run on a nominal 230 V at 50 Hz, the same as Montenegro, so the electrical rating of a part does not usually change at the border.

More Klima products for Montenegro

Condensate pumps in cities across Montenegro