Klima Industries

Capacitors for Equatorial Guinea

With about 1.3 million people, Equatorial Guinea is a smaller national market in Africa. Its capital is Ciudad de la Paz. Most of the country has a hot and humid tropical climate, and conditions vary by region. Temperatures stay high all year, typically from the high 20s to the mid 30s °C, with humidity often above 75 %.

Demand for capacitors comes mostly from offices, shops and malls as well as factories and workshops. Klima Industries lists 116 models in this range; a selection is shown below, and enquiries from Equatorial Guinea are welcome.

Capital
Ciudad de la Paz
Population
1.3 million
Area
28,051 km²
Time zone
UTC+1 all year
Climate
Hot and humid tropical
Supply
230 V, 50 Hz
Main ports
Malabo, Bata
Standards
applicable national electrical-safety and import conformity rules (generally IEC-based)

Klima Capacitors models

12 of 116 models are listed here. See all 116 models in Klima Capacitors.

All Klima products for Equatorial Guinea · Klima Capacitors overview

What Equatorial Guinea demands of capacitors

In Equatorial Guinea, cooling and refrigeration work in every month of the year. High humidity brings condensation and terminal corrosion, so favour insulated, well-sealed capacitors and keep control boxes closed with their gaskets intact.

Heat is the main enemy of electrical parts here: capacitors run hotter in outdoor units, so choose a higher temperature class and some rating margin, and re-check terminal tightness before each cooling season.

The mains supply in Equatorial Guinea is 230 V, 50 Hz. Match capacitors to that voltage class and confirm whether the equipment is single-phase or three-phase before you order.

Cities that buy capacitors in Equatorial Guinea

The two listed cities furthest apart, Malabo and Ebebiyin, are about 334 km from each other in a straight line, so most deliveries inside the country stay within a day of road. Ciudad de la Paz, the capital, lies about 121 km east of Bata, which is the largest listed city, so say which of the two cities a delivery is for. These are the biggest listed cities in Equatorial Guinea; the last column names what to watch for in capacitors there.

CityPeopleClimateWhat wears capacitors first
Bata173,000hot and humid tropicalterminals loosening and parts running hot
Malabo156,000hot and humid tropicalmoisture on terminals and corrosion
Ebebiyin25,000hot and humid tropicalterminals loosening and parts running hot
Ciudad de la Paz2,000hot and humid tropicalmoisture on terminals and corrosion

Daylight, sun angle and time in Equatorial Guinea

The clock in Ciudad de la Paz follows UTC+1 all year.

At 1.6° N, Ciudad de la Paz has about 12 h 13 min of daylight at the June solstice and about 12 h 02 min at the December solstice. The noon sun stands 68° above the horizon in June and 65° in December, and the sun climbs high in summer, so shade and ventilation around outdoor units matter.

How large is Equatorial Guinea, and how is it settled?

By land area Equatorial Guinea is the 96th smallest of the 241 places listed here, at roughly 28,051 km², almost exactly the size of Burundi (27,830 km²). Its 1.3 million people give an average of 47 per km². In this directory that is moderately settled, sparser than 69% of the other countries in this directory. People and businesses cluster around the main cities, so say which city or region the delivery is for. For scale, Estonia has a similar number of people (1.3 million).

Jobs in Equatorial Guinea that call for capacitors

Typical work in Equatorial Guinea that needs capacitors:

  • Packaged rooftop units and ducted systems
  • Fan coil unit and blower motors
  • Split and window air conditioners
  • Chiller and air-cooled condenser fans
  • Heat pump outdoor units

Klima capacitors models

ModelCapacitance (µF)Rated voltage (VAC)Type
Klima Run Capacitor 5 µF 440/370 V, Round5440 / 370Single run
Klima Dual Run Capacitor 45+7.5 µF 440/370 V, Round45 + 7.5440 / 370Dual run
Klima Motor Start Capacitor 64-77 µF 250 V64-77250Start
Klima Start Capacitor 216-259 µF 110/125 V, Round Phenolic Case216-259110 / 125Start
Klima CBB61 Start/Run Capacitor 4 µF 500 V AC4500Start/run
Klima CBB61 Start/Run Capacitor 12 µF 500 V AC, Terminal Type12500Start/run

See the full Klima Capacitors range for specifications, standards and a plain-language guide to choosing the right part.

Choosing capacitors for Equatorial Guinea

  • Choose a temperature class suited to where the unit sits. Rooftop and sun-baked installations need parts rated for higher ambient temperatures.
  • Match capacitance to the nameplate. Stay within the tolerance printed on the original capacitor, usually ±5 %; a value that is too low or too high shortens motor life.
  • Confirm the supply first: Equatorial Guinea uses 230 V at 50 Hz, so check the voltage and frequency rating of capacitors against the equipment nameplate.
  • For hot and humid tropical conditions in Equatorial Guinea, favour sealed, corrosion-resistant construction.

Care and maintenance in Equatorial Guinea

  • Measure capacitance during each seasonal service; a drop of more than about 10 % from the rated value is a reason to replace it.

With little seasonal change in temperature, air conditioning in Equatorial Guinea works almost every day. Spread checks of capacitors through the year instead of waiting for a peak. Weak electrical parts show up first at the start of a hot spell; checking them beforehand avoids emergency call-outs.

Signs of trouble

  • A humming compressor that fails to start, or a fan that has to be spun by hand

Approvals for capacitors sold into Equatorial Guinea

Klima capacitors follow IEC 60252-1 (AC motor capacitors). In Equatorial Guinea, the local framework is applicable national electrical-safety and import conformity rules (generally IEC-based), so match the datasheet to both and ask for any conformity documents your project needs.

Ordering capacitors for Equatorial Guinea

Sea freight into Equatorial Guinea normally clears through ports such as Malabo and Bata, with onward delivery by road; urgent parts can travel by air.

The local currency is the Franc (XAF), so confirm the quotation currency and delivery terms before you order. The main languages are Spanish, French and Portuguese; this site and its enquiry form are in English.

Wholesalers and installers who buy regularly can ask about trade terms. See the distributors page.

Capacitors in Equatorial Guinea: common questions

Are run capacitors polarised?

No. AC motor run capacitors are not polarised, so wiring polarity does not matter except where the terminals of a dual capacitor are labelled for different loads.

What voltage should capacitors be rated for in Equatorial Guinea?

With a 230 V, 50 Hz supply, Equatorial Guinea follows the standard 230/400 V, 50 Hz arrangement; check the rated voltage on every capacitor against the equipment it serves.

Which standards apply to capacitors in Equatorial Guinea?

Klima capacitors follow IEC 60252-1 (AC motor capacitors). In Equatorial Guinea the local framework is applicable national electrical-safety and import conformity rules (generally IEC-based); request the datasheet and conformity documents with your enquiry.

How are capacitors delivered to Equatorial Guinea?

Cargo for Equatorial Guinea usually arrives through Malabo and Bata; tell us your preferred port or delivery address with your enquiry.

Which cities in Equatorial Guinea can I order capacitors for?

Every listed city is covered. The largest are Bata (173,000), Malabo (156,000), Ebebiyin (25,000) and Ciudad de la Paz (2,000). The country page lists the rest.

Do the neighbours of Equatorial Guinea use the same mains supply?

Yes. Both listed neighbours (Gabon and Cameroon) run on a nominal 230 V at 50 Hz, the same as Equatorial Guinea, so the electrical rating of a part does not usually change at the border.

What local time and daylight should I plan for in Equatorial Guinea?

Ciudad de la Paz keeps UTC+1 all year. At 1.6° N there are about 12 h 13 min of daylight in June and about 12 h 02 min in December.

More Klima products for Equatorial Guinea

Capacitors in cities across Equatorial Guinea