Klima Industries

Buying cables in Caala

With about 130,000 people, Caala is a smaller city in Angola. Temperatures stay high all year, typically from the high 20s to the mid 30s °C, with humidity often above 75 %.

Cables are bought here mainly for offices, shops and malls as well as homes and apartments. The Klima range includes 6 models, each with a specification table; send an enquiry from Caala for a quotation.

Country
Angola
Population
130,000
Climate
Hot and humid tropical
Coordinates
12.9° S, 15.6° E
Time zone
UTC+1 all year
From Luanda
514 km south-east
Supply
230 V, 50 Hz

Klima Cables (3 & 4 Core) models

All Klima products for Caala · Klima Cables (3 & 4 Core) overview

What Caala demands of cables

In Caala, cooling and refrigeration work in every month of the year. Damp air can track across dirty or unprotected connections; fit cables with proper insulation and boots, and treat green corrosion on terminals as a reason to replace the part.

Heat is the main enemy of electrical parts here: cables run hotter in outdoor units, so choose a higher temperature class and some rating margin, and re-check terminal tightness before each cooling season.

Cities around Caala that need cables

Caala ranks 26th of the 30 listed cities in Angola and holds about 1.1% of the people living in them, about 4.7% of the size of Luanda, the largest. The capital, Luanda, is about 514 km away, to the north-west of Caala. For scale, Tychy in Poland has a similar population (130,000).

The closest are Huambo (21 km north-east), Catchiungo (79 km north-east) and Cuito (158 km east). Two other listed cities lie within 100 km, and nine within 300 km. The farthest listed city in Angola is Cabinda, about 891 km north-west of Caala.

CityDistancePeopleWhat wears cables first
Huambo21 km north-east595,000moisture on terminals and corrosion
Catchiungo79 km north-east121,000moisture on terminals and corrosion
Cuito158 km east355,000terminals loosening and parts running hot
Bocoio160 km west165,000moisture on terminals and corrosion
Lobito226 km west393,000terminals loosening and parts running hot
Benguela236 km west555,000terminals loosening and parts running hot

In a smaller city like Caala, local stock is often limited to common ratings. Keep spares of the parts that stop a system, and order the rest with a clear nameplate list.

Daylight and sun angle in Caala

The clock in Caala follows UTC+1 all year.

Caala lies at 12.9° S, 15.6° E. Daylight lasts about 11 h 22 min at the June solstice and about 12 h 53 min in December, with a noon sun 54° and 79° high; at its highest the sun stands almost overhead, so roof-mounted condensing units take its full heat for much of the day. Caala has a hot and humid tropical climate, the same as the country as a whole, and 29 other listed cities share it.

Jobs in Caala that call for cables

Typical work in Caala that needs cables:

  • Fan coil unit and VRF branch wiring
  • Indoor-to-outdoor interconnecting cable for split ACs
  • Pump, fan and compressor motor connections

Klima cables models

ModelCoresConductor size (mm²)Insulation
Klima 3-Core Flexible Cable 1.5 mm²31.5PVC
Klima 3-Core Flexible Cable 2.5 mm²32.5PVC
Klima 3-Core Flexible Cable 4 mm²34PVC
Klima 4-Core Flexible Cable 1.5 mm²41.5PVC

See the full Klima Cables (3 & 4 Core) range for specifications, standards and a plain-language guide to choosing the right part.

Choosing cables for Caala

  • Size the conductor from the unit's maximum running current and the cable length, and check that voltage drop stays within the limit in your local wiring rules.
  • Confirm the supply first: Angola uses 230 V at 50 Hz, so check the voltage and frequency rating of cables against the equipment nameplate.

Care and maintenance in Caala

  • Test insulation resistance before reusing existing runs in older installations.

With little seasonal change in temperature, air conditioning in Caala works almost every day. Spread checks of cables through the year instead of waiting for a peak. A failed electrical part in the peak weeks means a day without cooling, so replace weak ones early.

Signs of trouble

  • Warm cable or terminals under load

Supply and delivery to Caala

Shipments for Caala normally clear customs at one of the main entry points of Angola and finish the journey by road; send your delivery address with the enquiry.

National rules, standards and voltage for Angola are summarised on the country page.

Wholesalers and installers who buy regularly can ask about trade terms. See the distributors page.

Cables in Caala: common questions

How long can the cable run be?

The limit comes from voltage drop. Longer runs need larger conductors, so ask your installer to calculate the drop for your load, voltage and length.

What voltage should cables be rated for in Caala?

The mains supply in Angola is 230 V, 50 Hz. Match cables to that voltage class and confirm whether the equipment is single-phase or three-phase before you order.

How are cables delivered to Caala?

To order cables for Caala, give a delivery address or a collection point in your enquiry, and mention whether road, sea or air delivery suits the job.

Which parts of Caala can I order for?

Enquiries are welcome from every part of Caala. Send the delivery address with your enquiry.

Which cities near Caala can the same order serve?

The listed cities closest to Caala are Huambo (21 km north-east), Catchiungo (79 km north-east) and Cuito (158 km east). Combine them into one order and give each delivery address.

What local time and daylight should I plan for in Caala?

Caala keeps UTC+1 all year. At 12.9° S there are about 11 h 22 min of daylight in June and about 12 h 53 min in December.

More Klima products for Caala

Cables in cities near Caala