Klima Industries

Cables supply in Germany

Home to about 82.9 million people, Germany sits in Europe. Its capital is Berlin. The prevailing climate is temperate, though conditions differ between regions. Summers are warm rather than extreme and winters are cool, so heating matters as much as cooling.

The main users of cables in Germany are offices, shops and malls as well as factories and workshops. The Klima range includes 6 models, each with a specification table; send an enquiry from Germany for a quotation.

Capital
Berlin
Population
82.9 million
Area
357,021 km²
Time zone
UTC+1, moving to UTC+2 while daylight saving applies
Climate
Temperate
Supply
230 V, 50 Hz
Main ports
Hamburg, Bremerhaven
Standards
CE marking, RoHS and, where relevant, the Pressure Equipment Directive (PED) and F-gas regulations

Klima Cables (3 & 4 Core) models

All Klima products for Germany · Klima Cables (3 & 4 Core) overview

Conditions in Germany that affect cables

In Germany, cooling demand is seasonal, with short hot spells that stress equipment. Daily heating and cooling cycles work screwed and crimped connections loose over time; check the torque on the terminals of cables at least once a year.

Damp air can track across dirty or unprotected connections; fit cables with proper insulation and boots, and treat green corrosion on terminals as a reason to replace the part.

The mains supply in Germany is 230 V, 50 Hz. Match cables to that voltage class and confirm whether the equipment is single-phase or three-phase before you order.

Where cables are needed in Germany

The widest gap between listed cities runs from Freiburg to Rostock, about 741 km, so allow extra road time for the far end of the country. The three largest listed cities (Berlin, Hamburg and Munich) hold about 32% of the people living in listed cities, which means demand is spread across many cities. The table lists the largest cities in Germany with the climate stress that wears cables fastest in each.

CityPeopleClimateWhat wears cables first
Berlin3.4 milliontemperatemoisture on terminals and corrosion
Hamburg2 milliontemperateexpansion and contraction loosening joints
Munich1.5 milliontemperateexpansion and contraction loosening joints
Dusseldorf619,000temperateexpansion and contraction loosening joints
Essen593,000temperateexpansion and contraction loosening joints
Dresden565,000temperateexpansion and contraction loosening joints

The sun and the clock in Germany

Local time in Berlin is UTC+1, moving to UTC+2 while daylight saving applies.

At 52.5° N, Berlin has about 16 h 50 min of daylight at the June solstice and about 7 h 39 min at the December solstice. The noon sun stands 61° above the horizon in June and 14° in December, and the sun climbs high in summer, so shade and ventilation around outdoor units matter.

Voltage next door: Germany and its neighbours

Germany borders Switzerland, Poland, the Netherlands, Denmark, Belgium and 3 more. All of them use a nominal 230 V at 50 Hz, the same as Germany, so an electrical rating that fits one side of the border fits the other.

Where cables are used in Germany

Typical work in Germany that needs cables:

  • Building refurbishment and retrofit work
  • Fan coil unit and VRF branch wiring
  • Cold room evaporator and condensing unit wiring
  • Pump, fan and compressor motor connections
  • Indoor-to-outdoor interconnecting cable for split ACs

Klima cables models

ModelCoresConductor size (mm²)Insulation
Klima 3-Core Flexible Cable 1.5 mm²31.5PVC
Klima 3-Core Flexible Cable 2.5 mm²32.5PVC
Klima 3-Core Flexible Cable 4 mm²34PVC
Klima 4-Core Flexible Cable 1.5 mm²41.5PVC
Klima 4-Core Flexible Cable 2.5 mm²42.5PVC
Klima 4-Core Flexible Cable 4 mm²44PVC

See the full Klima Cables (3 & 4 Core) range for specifications, standards and a plain-language guide to choosing the right part.

Selecting cables in Germany

  • Use 4-core where the unit needs a communication or switched conductor, and 3-core for simple live-neutral-earth feeds.
  • Size the conductor from the unit's maximum running current and the cable length, and check that voltage drop stays within the limit in your local wiring rules.
  • Confirm the supply first: Germany uses 230 V at 50 Hz, so check the voltage and frequency rating of cables against the equipment nameplate.
  • For temperate conditions in Germany, allow for wide seasonal temperature swings.

Care and maintenance in Germany

  • Test insulation resistance before reusing existing runs in older installations.

Germany lies in the northern hemisphere, where cooling demand usually peaks in July and August. Schedule inspections of cables for May or June, ahead of that peak. Electrical parts fail most often when the load is highest, so retighten and test before the peak.

Faults to watch for

  • Intermittent unit shutdowns caused by damaged conductors

Approvals for cables sold into Germany

Two sets of rules apply to cables sold into Germany: the product standard, IEC 60227 and IEC 60245 (insulated flexible cables), and the local one, CE marking, RoHS and, where relevant, the Pressure Equipment Directive (PED) and F-gas regulations. Importers and consultants normally ask for datasheets and test documents, so request them with the enquiry.

Ordering cables for Germany

Cargo for Germany usually arrives through Hamburg and Bremerhaven; tell us your preferred port or delivery address with your enquiry.

The local currency is the Euro (EUR), so confirm the quotation currency and delivery terms before you order. The main languages are German; this site and its enquiry form are in English.

Wholesalers and installers who buy regularly can ask about trade terms. See the distributors page.

Cables in Germany: common questions

How long can the cable run be?

The limit comes from voltage drop. Longer runs need larger conductors, so ask your installer to calculate the drop for your load, voltage and length.

What voltage should cables be rated for in Germany?

With a 230 V, 50 Hz supply, Germany follows the standard 230/400 V, 50 Hz arrangement; check the rated voltage on every cable against the equipment it serves.

Which standards apply to cables in Germany?

Klima cables follow IEC 60227 and IEC 60245 (insulated flexible cables). In Germany the local framework is CE marking, RoHS and, where relevant, the Pressure Equipment Directive (PED) and F-gas regulations; request the datasheet and conformity documents with your enquiry.

How are cables delivered to Germany?

Sea freight into Germany normally clears through ports such as Hamburg and Bremerhaven, with onward delivery by road; urgent parts can travel by air.

Which cities in Germany can I order cables for?

Every listed city is covered. The largest are Berlin (3.4 million), Hamburg (2 million), Munich (1.5 million), Cologne (1 million) and Frankfurt am Main (650,000). The country page lists the rest.

Do the neighbours of Germany use the same mains supply?

Yes. All 8 listed neighbours (Switzerland, Poland, the Netherlands, Denmark, Belgium and 3 more) run on a nominal 230 V at 50 Hz, the same as Germany, so the electrical rating of a part does not usually change at the border.

What local time and daylight should I plan for in Germany?

Berlin keeps UTC+1, moving to UTC+2 while daylight saving applies. At 52.5° N there are about 16 h 50 min of daylight in June and about 7 h 39 min in December.

More Klima products for Germany

Cables in cities across Germany