Klima Industries

Cables supply in Swedru

Found in Ghana, Swedru is a smaller city with a hot and humid tropical climate. Temperatures stay high all year, typically from the high 20s to the mid 30s °C, with humidity often above 75 %.

Demand for cables comes mostly from offices, shops and malls as well as homes and apartments. The range below has 6 models; send an enquiry with the model code and your delivery address in Swedru.

Country
Ghana
Population
54,000
Climate
Hot and humid tropical
Coordinates
5.5° N, 0.7° W
Time zone
UTC+0 all year
From Accra
56 km west
Supply
230 V, 50 Hz

Klima Cables (3 & 4 Core) models

All Klima products for Swedru · Klima Cables (3 & 4 Core) overview

Conditions in Swedru that affect cables

In Swedru, cooling and refrigeration work in every month of the year. Damp air can track across dirty or unprotected connections; fit cables with proper insulation and boots, and treat green corrosion on terminals as a reason to replace the part.

Outdoor units sit in direct sun, which raises component temperatures well above the air temperature; cables with generous ratings and secure terminations last longer than parts chosen to the bare nameplate value.

Cities around Swedru that need cables

Among the 30 listed cities in Ghana, Swedru comes 27th by population, with about 0.7% of the listed urban population, roughly 2.1% of the size of the largest city, Kumasi. The capital, Accra, is about 56 km away, to the east of Swedru. For scale, Narva in Estonia has a similar population (54,000).

The closest are Winneba (22 km south), Buduburam (25 km east) and Atsiaman (45 km north-east). Nine other listed cities lie within 100 km, and 21 within 300 km. At the other extreme, Bawku is about 616 km north of Swedru, the furthest listed city in Ghana.

CityDistancePeopleWhat wears cables first
Winneba22 km south71,000moisture on terminals and corrosion
Buduburam25 km east63,000terminals loosening and parts running hot
Atsiaman45 km north-east203,000terminals loosening and parts running hot
Akim Oda54 km north-west61,000terminals loosening and parts running hot
Accra56 km east2 millionterminals loosening and parts running hot
Suhum62 km north-east51,000terminals loosening and parts running hot

In a smaller city like Swedru, local stock is often limited to common ratings. Keep spares of the parts that stop a system, and order the rest with a clear nameplate list.

Time zone, sun and daylight in Swedru

The clock in Swedru follows UTC+0 all year.

At 5.5° N, Swedru has about 12 h 27 min of daylight at the June solstice and about 11 h 48 min at the December solstice. The noon sun stands 72° above the horizon in June and 61° in December, and the summer sun is high, so outdoor units in unshaded spots take strong direct heat. Swedru has a hot and humid tropical climate, the same as the country as a whole, and 29 other listed cities share it.

Typical uses of cables in Swedru

In Swedru, these are the jobs that most often call for cables:

  • Cold room evaporator and condensing unit wiring
  • Fan coil unit and VRF branch wiring
  • Pump, fan and compressor motor connections

Klima cables models

ModelCoresConductor size (mm²)Insulation
Klima 3-Core Flexible Cable 1.5 mm²31.5PVC
Klima 3-Core Flexible Cable 2.5 mm²32.5PVC
Klima 3-Core Flexible Cable 4 mm²34PVC
Klima 4-Core Flexible Cable 1.5 mm²41.5PVC

See the full Klima Cables (3 & 4 Core) range for specifications, standards and a plain-language guide to choosing the right part.

How to pick cables for work in Swedru

  • Check core colours against local wiring colour codes before terminating.
  • For hot and humid tropical conditions in Swedru, favour sealed, corrosion-resistant construction.

Keeping cables reliable in Swedru

  • Protect cable where it passes through walls and metal edges with grommets or sleeves.

A tropical climate keeps cooling demand steady through the year in Swedru, so there is no quiet season. Schedule checks of cables around the main rainy-season changes and keep spares on hand. Weak electrical parts show up first at the start of a hot spell; checking them beforehand avoids emergency call-outs.

Signs of trouble

  • Discoloured or brittle sheathing near hot refrigerant lines

Ordering cables for Swedru

Shipments for Swedru normally clear customs at one of the main entry points of Ghana and finish the journey by road; send your delivery address with the enquiry.

National rules, standards and voltage for Ghana are summarised on the country page.

Contractors and traders can ask for trade terms through the distributors page. See the distributors page.

Cables in Swedru: common questions

Can I use PVC cable outdoors?

Yes where it is protected from direct sunlight and mechanical damage, for example inside conduit or trunking. Exposed runs benefit from UV-resistant cable or extra protection.

What voltage should cables be rated for in Swedru?

The mains supply in Ghana is 230 V, 50 Hz. Match cables to that voltage class and confirm whether the equipment is single-phase or three-phase before you order.

How are cables delivered to Swedru?

To order cables for Swedru, give a delivery address or a collection point in your enquiry, and mention whether road, sea or air delivery suits the job.

Which parts of Swedru can I order for?

Enquiries are welcome from every part of Swedru. Send the delivery address with your enquiry.

Which cities near Swedru can the same order serve?

The listed cities closest to Swedru are Winneba (22 km south), Buduburam (25 km east) and Atsiaman (45 km north-east). Combine them into one order and give each delivery address.

What local time and daylight should I plan for in Swedru?

Swedru keeps UTC+0 all year. At 5.5° N there are about 12 h 27 min of daylight in June and about 11 h 48 min in December.

More Klima products for Swedru

Cables in cities near Swedru