Klima Industries

Klima Cables (3 & 4 Core) supplied to Gonaives

Found in Haiti, Gonaives is a smaller city with a hot and humid tropical climate. Temperatures stay high all year, typically from the high 20s to the mid 30s °C, with humidity often above 75 %.

Demand for cables comes mostly from offices, shops and malls as well as factories and workshops. The Klima range includes 6 models, each with a specification table; send an enquiry from Gonaives for a quotation.

Country
Haiti
Population
85,000
Climate
Hot and humid tropical
Coordinates
19.4° N, 72.7° W
Time zone
UTC-5, moving to UTC-4 while daylight saving applies
From Port-au-Prince
107 km north
Supply
110 V, 60 Hz

Klima Cables (3 & 4 Core) models

All Klima products for Gonaives · Klima Cables (3 & 4 Core) overview

What Gonaives demands of cables

In Gonaives, cooling and refrigeration work in every month of the year. Damp air can track across dirty or unprotected connections; fit cables with proper insulation and boots, and treat green corrosion on terminals as a reason to replace the part.

Heat is the main enemy of electrical parts here: cables run hotter in outdoor units, so choose a higher temperature class and some rating margin, and re-check terminal tightness before each cooling season.

Cables in Gonaives and the cities near it

Among the 21 listed cities in Haiti, Gonaives comes 15th by population, with about 2.2% of the listed urban population, roughly 6.9% of the size of the largest city, Port-au-Prince. The capital, Port-au-Prince, is about 107 km away, to the south of Gonaives. For scale, Rukban in Jordan has a similar population (85,000).

Nearest to Gonaives: Dessalines (28 km south-east), Saint-Marc (37 km south) and Saint-Michel de l'Atalaye (38 km east). 10 other listed cities lie within 100 km, and 20 within 300 km.

CityDistancePeopleWhat wears cables first
Dessalines28 km south-east182,000moisture on terminals and corrosion
Saint-Marc37 km south267,000moisture on terminals and corrosion
Saint-Michel de l'Atalaye38 km east95,000terminals loosening and parts running hot
Lenbe42 km north-east33,000terminals loosening and parts running hot
Verrettes50 km south-east49,000moisture on terminals and corrosion
Saint-Raphael51 km east38,000terminals loosening and parts running hot

In a smaller city like Gonaives, local stock is often limited to common ratings. Keep spares of the parts that stop a system, and order the rest with a clear nameplate list.

Daylight and sun angle in Gonaives

The clock in Gonaives follows UTC-5, moving to UTC-4 while daylight saving applies.

Gonaives lies at 19.4° N, 72.7° W. Daylight lasts about 13 h 18 min at the June solstice and about 10 h 57 min in December, with a noon sun 86° and 47° high; the sun climbs almost to the zenith, so outdoor units on roofs and in open yards take the full load of its heat. Gonaives has a hot and humid tropical climate, the same as the country as a whole, and 20 other listed cities share it.

Typical uses of cables in Gonaives

Typical work in Gonaives that needs cables:

  • Fan coil unit and VRF branch wiring
  • Control panels and sub-distribution boards
  • Indoor-to-outdoor interconnecting cable for split ACs

Klima cables models

ModelCoresConductor size (mm²)Insulation
Klima 3-Core Flexible Cable 1.5 mm²31.5PVC
Klima 3-Core Flexible Cable 2.5 mm²32.5PVC
Klima 3-Core Flexible Cable 4 mm²34PVC
Klima 4-Core Flexible Cable 1.5 mm²41.5PVC

See the full Klima Cables (3 & 4 Core) range for specifications, standards and a plain-language guide to choosing the right part.

How to pick cables for work in Gonaives

  • Choose the insulation class for the route. Outdoor runs exposed to sunlight need UV-resistant sheathing or conduit protection.
  • Ask for the datasheet and the documents your project needs; in Haiti that usually means applicable national electrical-safety and import conformity rules (generally IEC-based).

Care and maintenance in Gonaives

  • Support outdoor runs with clips or conduit so the sheath does not chafe or sag.

A tropical climate keeps cooling demand steady through the year in Gonaives, so there is no quiet season. Schedule checks of cables around the main rainy-season changes and keep spares on hand. A failed electrical part in the peak weeks means a day without cooling, so replace weak ones early.

Signs of trouble

  • Warm cable or terminals under load

Getting cables to Gonaives

Shipments for Gonaives normally clear customs at one of the main entry points of Haiti and finish the journey by road; send your delivery address with the enquiry.

National rules, standards and voltage for Haiti are summarised on the country page.

Contractors and traders can ask for trade terms through the distributors page. See the distributors page.

Cables in Gonaives: common questions

How long can the cable run be?

The limit comes from voltage drop. Longer runs need larger conductors, so ask your installer to calculate the drop for your load, voltage and length.

What voltage should cables be rated for in Gonaives?

Equipment in Haiti runs from 110 V at 60 Hz; make sure the cable you choose carries the right voltage and frequency rating for 60 Hz operation.

How are cables delivered to Gonaives?

To order cables for Gonaives, give a delivery address or a collection point in your enquiry, and mention whether road, sea or air delivery suits the job.

Which parts of Gonaives can I order for?

Enquiries are welcome from every part of Gonaives. Send the delivery address with your enquiry.

What local time and daylight should I plan for in Gonaives?

Gonaives keeps UTC-5, moving to UTC-4 while daylight saving applies. At 19.4° N there are about 13 h 18 min of daylight in June and about 10 h 57 min in December.

Which cities near Gonaives can the same order serve?

The listed cities closest to Gonaives are Dessalines (28 km south-east), Saint-Marc (37 km south) and Saint-Michel de l'Atalaye (38 km east). Combine them into one order and give each delivery address.

More Klima products for Gonaives

Cables in cities near Gonaives