Klima Industries

Klima Cables (3 & 4 Core) in Rundu

Found in Namibia, Rundu is a smaller city with a hot and arid climate. Summer daytime temperatures commonly pass 40 °C, and equipment in direct sun runs far hotter than the air.

The main users of cables in Rundu are offices, shops and malls, factories and workshops as well as homes and apartments. The range below has 6 models; send an enquiry with the model code and your delivery address in Rundu.

Country
Namibia
Population
75,000
Climate
Hot and arid
Coordinates
17.9° S, 19.8° E
Time zone
UTC+2 all year
From Windhoek
587 km north-east
Supply
230 V, 50 Hz

Klima Cables (3 & 4 Core) models

All Klima products for Rundu · Klima Cables (3 & 4 Core) overview

Conditions in Rundu that affect cables

In Rundu, air conditioning and refrigeration run for most of the year. Heat is the main enemy of electrical parts here: cables run hotter in outdoor units, so choose a higher temperature class and some rating margin, and re-check terminal tightness before each cooling season.

Dust and sand work their way into outdoor control boxes; closed covers, intact gaskets and regular cleaning keep cables cooler and connections reliable.

Cities around Rundu that need cables

Among the 14 listed cities in Namibia, Rundu comes 2nd by population, with about 8.5% of the listed urban population, roughly 19% of the size of the largest city, Windhoek. Rundu lies about 587 km north-east of Windhoek, the capital. It is about the same size as Mek'i in Ethiopia, which has 75,000.

In the directory the nearest cities are Grootfontein (255 km south-west), Ondangwa (401 km west) and Helao Nafidi (415 km west). No other listed city lies within 100 km, and one lies within 300 km. The farthest listed city in Namibia is Keetmanshoop, about 977 km south of Rundu.

CityDistancePeopleWhat wears cables first
Grootfontein255 km south-west24,000dust on contacts and blocked cooling
Ondangwa401 km west27,000dust on contacts and blocked cooling
Helao Nafidi415 km west23,000dust on contacts and blocked cooling
Ongwediva424 km west24,000dust on contacts and blocked cooling
Oshakati431 km west43,000dust on contacts and blocked cooling
Otjiwarongo433 km south-west33,000terminals loosening and parts running hot

In a smaller city like Rundu, local stock is often limited to common ratings. Keep spares of the parts that stop a system, and order the rest with a clear nameplate list.

Daylight and sun angle in Rundu

The clock in Rundu follows UTC+2 all year.

At 17.9° S, Rundu has about 11 h 03 min of daylight at the June solstice and about 13 h 12 min at the December solstice. The noon sun stands 49° above the horizon in June and 84° in December, and the sun climbs almost to the zenith, so outdoor units on roofs and in open yards take the full load of its heat. The climate in Rundu is hot and arid, in line with the rest of Namibia; 13 other listed cities share it.

Typical uses of cables in Rundu

Typical work in Rundu that needs cables:

  • Indoor-to-outdoor interconnecting cable for split ACs
  • Building refurbishment and retrofit work
  • Power supply to packaged and ducted units

Klima cables models

ModelCoresConductor size (mm²)Insulation
Klima 3-Core Flexible Cable 1.5 mm²31.5PVC
Klima 3-Core Flexible Cable 2.5 mm²32.5PVC
Klima 3-Core Flexible Cable 4 mm²34PVC
Klima 4-Core Flexible Cable 1.5 mm²41.5PVC

See the full Klima Cables (3 & 4 Core) range for specifications, standards and a plain-language guide to choosing the right part.

How to pick cables for work in Rundu

  • Check core colours against local wiring colour codes before terminating.
  • For hot and arid conditions in Rundu, favour higher temperature ratings and some margin on every rated value.

Keeping cables reliable in Rundu

  • Protect cable where it passes through walls and metal edges with grommets or sleeves.

Because Rundu is in the southern hemisphere, the heaviest cooling load normally falls from November to March. Service cables in September or October, while the load is still light. Weak electrical parts show up first at the start of a hot spell; checking them beforehand avoids emergency call-outs.

Signs of trouble

  • Warm cable or terminals under load

Getting cables to Rundu

Shipments for Rundu normally clear customs at one of the main entry points of Namibia and finish the journey by road; send your delivery address with the enquiry.

National rules, standards and voltage for Namibia are summarised on the country page.

Contractors and traders can ask for trade terms through the distributors page. See the distributors page.

Questions about cables in Rundu

Should I use flexible or solid cable?

Flexible stranded cable suits equipment connections and conduit pulls. Solid conductor is common in fixed wiring but harder to terminate at unit terminals.

What voltage should cables be rated for in Rundu?

The mains supply in Namibia is 230 V, 50 Hz. Match cables to that voltage class and confirm whether the equipment is single-phase or three-phase before you order.

How are cables delivered to Rundu?

To order cables for Rundu, give a delivery address or a collection point in your enquiry, and mention whether road, sea or air delivery suits the job.

Which parts of Rundu can I order for?

Enquiries are welcome from every part of Rundu. Send the delivery address with your enquiry.

What local time and daylight should I plan for in Rundu?

Rundu keeps UTC+2 all year. At 17.9° S there are about 11 h 03 min of daylight in June and about 13 h 12 min in December.

Which cities near Rundu can the same order serve?

The listed cities closest to Rundu are Grootfontein (255 km south-west), Ondangwa (401 km west) and Helao Nafidi (415 km west). Combine them into one order and give each delivery address.

More Klima products for Rundu

Cables in cities near Rundu