Klima Industries

Klima Cables (3 & 4 Core) in Goroka

With about 19,000 people, Goroka is a smaller city in Papua New Guinea. Temperatures stay high all year, typically from the high 20s to the mid 30s °C, with humidity often above 75 %.

Demand for cables comes mostly from offices, shops and malls as well as factories and workshops. The Klima range includes 6 models, each with a specification table; send an enquiry from Goroka for a quotation.

Country
Papua New Guinea
Population
19,000
Climate
Hot and humid tropical
Coordinates
6.1° S, 145.4° E
Time zone
UTC+10 all year
From Port Moresby
424 km north-west
Supply
230 V, 50 Hz

Klima Cables (3 & 4 Core) models

All Klima products for Goroka · Klima Cables (3 & 4 Core) overview

Cables and the climate in Goroka

In Goroka, cooling and refrigeration work in every month of the year. High humidity brings condensation and terminal corrosion, so favour insulated, well-sealed cables and keep control boxes closed with their gaskets intact.

Heat is the main enemy of electrical parts here: cables run hotter in outdoor units, so choose a higher temperature class and some rating margin, and re-check terminal tightness before each cooling season.

Cities around Goroka that need cables

Among the 13 listed cities in Papua New Guinea, Goroka comes 10th by population, with about 2.9% of the listed urban population, about 6.5% of the size of Port Moresby, the largest. Goroka lies about 424 km north-west of Port Moresby, the capital.

The closest are Madang (106 km north-east), Mount Hagen (130 km west) and Bulolo (186 km south-east). No other listed city lies within 100 km, and five lie within 300 km. The farthest listed city in Papua New Guinea is Arawa, about 1,125 km east of Goroka.

CityDistancePeopleWhat wears cables first
Madang106 km north-east27,000terminals loosening and parts running hot
Mount Hagen130 km west34,000moisture on terminals and corrosion
Bulolo186 km south-east16,000terminals loosening and parts running hot
Lae191 km east76,000terminals loosening and parts running hot
Mendi191 km west26,000moisture on terminals and corrosion
Wewak342 km north-west18,000terminals loosening and parts running hot

In a smaller city like Goroka, local stock is often limited to common ratings. Keep spares of the parts that stop a system, and order the rest with a clear nameplate list.

The sun and the clock in Goroka

Goroka keeps UTC+10 all year.

At 6.1° S, Goroka has about 11 h 46 min of daylight at the June solstice and about 12 h 29 min at the December solstice. The noon sun stands 60° above the horizon in June and 73° in December, and the summer sun is high, so outdoor units in unshaded spots take strong direct heat. The climate in Goroka is hot and humid tropical, in line with the rest of Papua New Guinea; 12 other listed cities share it.

Where cables are used in Goroka

Cables are most often specified in Goroka for:

  • Control panels and sub-distribution boards
  • Fan coil unit and VRF branch wiring
  • Building refurbishment and retrofit work

Klima cables models

ModelCoresConductor size (mm²)Insulation
Klima 3-Core Flexible Cable 1.5 mm²31.5PVC
Klima 3-Core Flexible Cable 2.5 mm²32.5PVC
Klima 3-Core Flexible Cable 4 mm²34PVC
Klima 4-Core Flexible Cable 1.5 mm²41.5PVC

See the full Klima Cables (3 & 4 Core) range for specifications, standards and a plain-language guide to choosing the right part.

Selecting cables in Goroka

  • Use 4-core where the unit needs a communication or switched conductor, and 3-core for simple live-neutral-earth feeds.
  • For hot and humid tropical conditions in Goroka, favour sealed, corrosion-resistant construction.

Care and maintenance in Goroka

  • Support outdoor runs with clips or conduit so the sheath does not chafe or sag.

With little seasonal change in temperature, air conditioning in Goroka works almost every day. Spread checks of cables through the year instead of waiting for a peak. A failed electrical part in the peak weeks means a day without cooling, so replace weak ones early.

Faults to watch for

  • Intermittent unit shutdowns caused by damaged conductors

Supply and delivery to Goroka

Shipments for Goroka normally clear customs at one of the main entry points of Papua New Guinea and finish the journey by road; send your delivery address with the enquiry.

National rules, standards and voltage for Papua New Guinea are summarised on the country page.

Contractors and traders can ask for trade terms through the distributors page. See the distributors page.

Cables in Goroka: common questions

Should I use flexible or solid cable?

Flexible stranded cable suits equipment connections and conduit pulls. Solid conductor is common in fixed wiring but harder to terminate at unit terminals.

What voltage should cables be rated for in Goroka?

The mains supply in Papua New Guinea is 230 V, 50 Hz. Match cables to that voltage class and confirm whether the equipment is single-phase or three-phase before you order.

How are cables delivered to Goroka?

To order cables for Goroka, give a delivery address or a collection point in your enquiry, and mention whether road, sea or air delivery suits the job.

Which parts of Goroka can I order for?

Enquiries are welcome from every part of Goroka. Send the delivery address with your enquiry.

Which cities near Goroka can the same order serve?

The listed cities closest to Goroka are Madang (106 km north-east), Mount Hagen (130 km west) and Bulolo (186 km south-east). Combine them into one order and give each delivery address.

What local time and daylight should I plan for in Goroka?

Goroka keeps UTC+10 all year. At 6.1° S there are about 11 h 46 min of daylight in June and about 12 h 29 min in December.

More Klima products for Goroka

Cables in cities near Goroka