With about 536,000 people, Poznan is a mid-sized city in Poland. Summers are warm to hot and winters are cold, with a wide swing between the seasons.

Demand for cables comes mostly from offices, shops and malls as well as factories and workshops. Klima Industries lists 6 models in this range with full specifications below, and enquiries from Poznan are welcome.

Country
Poland
Population
536,000
Climate
Continental
Coordinates
52.4° N, 16.9° E
Time zone
UTC+1, moving to UTC+2 while daylight saving applies
From Warsaw
278 km west
Supply
230 V, 50 Hz

Klima Cables (3 & 4 Core) models

All Klima products for Poznan · Klima Cables (3 & 4 Core) overview

What Poznan demands of cables

In Poznan, cooling peaks in a short, hot summer, and sub-zero spells are normal in winter. Daily heating and cooling cycles work screwed and crimped connections loose over time; check the torque on the terminals of cables at least once a year.

Low temperatures make plastics brittle and slow some electrical parts; let cold cables warm up before fitting where you can, and never force a terminal.

Cables in Poznan and the cities near it

By population Poznan is 5th of the 33 cities listed for Poland, with roughly 5.2% of their combined population, about 31% of the size of Warsaw, the largest. From Warsaw, the capital, Poznan is roughly 278 km to the west. For scale, Leeds in the United Kingdom has a similar population (536,000).

Nearest to Poznan: Bydgoszcz (108 km north-east), Zielona Gora (110 km south-west) and Torun (131 km north-east). No other listed city lies within 100 km, and 24 lie within 300 km. At the other extreme, Rzeszow is about 440 km south-east of Poznan, the furthest listed city in Poland.

CityDistancePeopleWhat wears cables first
Bydgoszcz108 km north-east330,000brittle insulation and hard starting
Zielona Gora110 km south-west118,000brittle insulation and hard starting
Torun131 km north-east197,000expansion and contraction loosening joints
Wroclaw145 km south673,000expansion and contraction loosening joints
Wloclawek147 km east120,000brittle insulation and hard starting
Walbrzych187 km south127,000expansion and contraction loosening joints

A mid-sized city like Poznan may not hold every rating in stock, so group your needs into one order and send the nameplate details for each part.

The sun and the clock in Poznan

Local time in Poznan is UTC+1, moving to UTC+2 while daylight saving applies.

At 52.4° N, Poznan has about 16 h 49 min of daylight at the June solstice and about 7 h 40 min at the December solstice. The noon sun stands 61° above the horizon in June and 14° in December, and the sun climbs high in summer, so shade and ventilation around outdoor units matter. Poznan has a continental climate, the same as the country as a whole, and 32 other listed cities share it.

Where cables are used in Poznan

Typical work in Poznan that needs cables:

  • Power supply to packaged and ducted units
  • Cold room evaporator and condensing unit wiring
  • Fan coil unit and VRF branch wiring

Klima cables models

ModelCoresConductor size (mm²)Insulation
Klima 3-Core Flexible Cable 1.5 mm²31.5PVC
Klima 3-Core Flexible Cable 2.5 mm²32.5PVC
Klima 3-Core Flexible Cable 4 mm²34PVC
Klima 4-Core Flexible Cable 1.5 mm²41.5PVC

See the full Klima Cables (3 & 4 Core) range for specifications, standards and a plain-language guide to choosing the right part.

Choosing cables for Poznan

  • Avoid splices inside walls; use terminal blocks in accessible enclosures.
  • Ask for the datasheet and the documents your project needs; in Poland that usually means CE marking, RoHS and, where relevant, the Pressure Equipment Directive (PED) and F-gas regulations.

Care and maintenance in Poznan

  • Protect cable where it passes through walls and metal edges with grommets or sleeves.

In the northern hemisphere the busiest cooling months fall from June to August; April or May is a sensible time to check cables in Poznan. Weak electrical parts show up first at the start of a hot spell; checking them beforehand avoids emergency call-outs.

Faults to watch for

  • Intermittent unit shutdowns caused by damaged conductors

Getting cables to Poznan

To order cables for Poznan, give a delivery address or a collection point in your enquiry, and mention whether road, sea or air delivery suits the job.

National rules, standards and voltage for Poland are summarised on the country page.

Wholesalers and installers who buy regularly can ask about trade terms. See the distributors page.

Questions about cables in Poznan

What is the difference between 3-core and 4-core cable?

3-core cable normally carries live, neutral and earth. 4-core adds a fourth conductor for communication or a switched supply, or carries three live phases plus earth on small three-phase equipment.

What voltage should cables be rated for in Poznan?

With a 230 V, 50 Hz supply, Poland follows the standard 230/400 V, 50 Hz arrangement; check the rated voltage on every cable against the equipment it serves.

How are cables delivered to Poznan?

Shipments for Poznan normally clear customs at one of the main entry points of Poland and finish the journey by road; send your delivery address with the enquiry.

Which parts of Poznan can I order for?

Enquiries are welcome from every part of Poznan. Send the delivery address with your enquiry.

What local time and daylight should I plan for in Poznan?

Poznan keeps UTC+1, moving to UTC+2 while daylight saving applies. At 52.4° N there are about 16 h 49 min of daylight in June and about 7 h 40 min in December.

Which cities near Poznan can the same order serve?

The listed cities closest to Poznan are Bydgoszcz (108 km north-east), Zielona Gora (110 km south-west) and Torun (131 km north-east). Combine them into one order and give each delivery address.

More Klima products for Poznan

Cables in cities near Poznan