Klima Industries

Buying cables in Evora

Found in Portugal, Evora is a smaller city with a Mediterranean climate. Summers are hot and dry, with long spells above 30 °C, and winters are mild and wetter.

Cables are bought here mainly for offices, shops and malls, factories and workshops as well as homes and apartments. The Klima range includes 6 models, each with a specification table; send an enquiry from Evora for a quotation.

Country
Portugal
Population
54,000
Climate
Mediterranean
Coordinates
38.6° N, 7.9° W
Time zone
UTC+0, moving to UTC+1 while daylight saving applies
From Lisbon
110 km east
Supply
230 V, 50 Hz

Klima Cables (3 & 4 Core) models

All Klima products for Evora · Klima Cables (3 & 4 Core) overview

Conditions in Evora that affect cables

In Evora, cooling demand peaks from late spring to early autumn. Outdoor units sit in direct sun, which raises component temperatures well above the air temperature; cables with generous ratings and secure terminations last longer than parts chosen to the bare nameplate value.

Large temperature swings expand and contract terminals every day, which gradually loosens connections, so re-tighten the terminals of cables during each seasonal service.

Cables in Evora and the cities near it

Evora ranks 14th of the 21 listed cities in Portugal and holds about 2.4% of the people living in them, roughly 10% of the size of the largest city, Lisbon. Evora lies about 110 km east of Lisbon, the capital. It is about the same size as Frydek-Mistek in the Czech Republic, which has 54,000.

The closest are Setubal (86 km west), Sesimbra (105 km west) and Lisbon (110 km west). One other listed city lies within 100 km, and 15 within 300 km. At the other extreme, Funchal is about 1,046 km south-west of Evora, the furthest listed city in Portugal.

CityDistancePeopleWhat wears cables first
Setubal86 km west118,000terminals loosening and parts running hot
Sesimbra105 km west41,000terminals loosening and parts running hot
Lisbon110 km west518,000terminals loosening and parts running hot
Monsanto122 km north-west50,000expansion and contraction loosening joints
Rio de Mouro126 km west55,000terminals loosening and parts running hot
Algueirao128 km west66,000expansion and contraction loosening joints

In a smaller city like Evora, local stock is often limited to common ratings. Keep spares of the parts that stop a system, and order the rest with a clear nameplate list.

The sun and the clock in Evora

The clock in Evora follows UTC+0, moving to UTC+1 while daylight saving applies.

At 38.6° N, Evora has about 14 h 52 min of daylight at the June solstice and about 9 h 28 min at the December solstice. The noon sun stands 75° above the horizon in June and 28° in December, and the summer sun is high, so outdoor units in unshaded spots take strong direct heat. The climate in Evora is Mediterranean, in line with the rest of Portugal; 20 other listed cities share it.

Typical uses of cables in Evora

Cables are most often specified in Evora for:

  • Fan coil unit and VRF branch wiring
  • Building refurbishment and retrofit work
  • Control panels and sub-distribution boards

Klima cables models

ModelCoresConductor size (mm²)Insulation
Klima 3-Core Flexible Cable 1.5 mm²31.5PVC
Klima 3-Core Flexible Cable 2.5 mm²32.5PVC
Klima 3-Core Flexible Cable 4 mm²34PVC
Klima 4-Core Flexible Cable 1.5 mm²41.5PVC

See the full Klima Cables (3 & 4 Core) range for specifications, standards and a plain-language guide to choosing the right part.

How to pick cables for work in Evora

  • Avoid splices inside walls; use terminal blocks in accessible enclosures.
  • For Mediterranean conditions in Evora, favour higher temperature ratings and some margin on every rated value.

Care and maintenance in Evora

  • Test insulation resistance before reusing existing runs in older installations.

Evora lies in the northern hemisphere, where cooling demand usually peaks from June to September. Schedule inspections of cables for April or May, ahead of that peak. A failed electrical part in the peak weeks means a day without cooling, so replace weak ones early.

Signs of trouble

  • Discoloured or brittle sheathing near hot refrigerant lines

Getting cables to Evora

To order cables for Evora, give a delivery address or a collection point in your enquiry, and mention whether road, sea or air delivery suits the job.

National rules, standards and voltage for Portugal are summarised on the country page.

Contractors and traders can ask for trade terms through the distributors page. See the distributors page.

Cables in Evora: common questions

Which cable size do I need for an air conditioner?

It depends on the unit's maximum current, the cable length and the installation method. Many residential split units use 1.5 mm² to 2.5 mm² conductors, but always follow the unit's installation manual and your local wiring rules.

What voltage should cables be rated for in Evora?

With a 230 V, 50 Hz supply, Portugal follows the standard 230/400 V, 50 Hz arrangement; check the rated voltage on every cable against the equipment it serves.

How are cables delivered to Evora?

Shipments for Evora normally clear customs at one of the main entry points of Portugal and finish the journey by road; send your delivery address with the enquiry.

Which parts of Evora can I order for?

Enquiries are welcome from every part of Evora. Send the delivery address with your enquiry.

Which cities near Evora can the same order serve?

The listed cities closest to Evora are Setubal (86 km west), Sesimbra (105 km west) and Lisbon (110 km west). Combine them into one order and give each delivery address.

What local time and daylight should I plan for in Evora?

Evora keeps UTC+0, moving to UTC+1 while daylight saving applies. At 38.6° N there are about 14 h 52 min of daylight in June and about 9 h 28 min in December.

More Klima products for Evora

Cables in cities near Evora