Klima Industries

Klima Cables (3 & 4 Core) supplied to Romania

With about 19.5 million people, Romania is a mid-sized market in Europe. Its capital is Bucharest. The prevailing climate is continental, though conditions differ between regions. Summers are warm to hot and winters are cold, with a wide swing between the seasons.

Demand for cables comes mostly from offices, shops and malls as well as factories and workshops. The range below has 6 models; send an enquiry with the model code and your delivery address in Romania.

Capital
Bucharest
Population
19.5 million
Area
237,500 km²
Time zone
UTC+2, moving to UTC+3 while daylight saving applies
Climate
Continental
Supply
230 V, 50 Hz
Main ports
Constanta
Standards
CE marking, RoHS and, where relevant, the Pressure Equipment Directive (PED) and F-gas regulations

Klima Cables (3 & 4 Core) models

All Klima products for Romania · Klima Cables (3 & 4 Core) overview

What Romania demands of cables

In Romania, cooling peaks in a short, hot summer, and sub-zero spells are normal in winter. Large temperature swings expand and contract terminals every day, which gradually loosens connections, so re-tighten the terminals of cables during each seasonal service.

In winter the cold stiffens cable and plastic insulation, so handle cables carefully, avoid sharp bends in cold PVC and check connections after the first hard frost.

With a 230 V, 50 Hz supply, Romania follows the standard 230/400 V, 50 Hz arrangement; check the rated voltage on every cable against the equipment it serves.

Cables across the cities of Romania

The three largest listed cities (Bucharest, Iasi and Constanta) hold about 42% of the people living in listed cities, which means there are a few big markets and a long tail of smaller ones. From Constanta to Arad, the longest straight-line gap between listed cities is about 615 km; so delivery to the far end of the country is a long road journey. Climate decides how cables age, and it changes from city to city in Romania: the last column shows what to expect.

CityPeopleClimateWhat wears cables first
Bucharest1.9 millioncontinentalbrittle insulation and hard starting
Iasi379,000continentalexpansion and contraction loosening joints
Constanta318,000continentalexpansion and contraction loosening joints
Cluj-Napoca287,000continentalbrittle insulation and hard starting
Brasov253,000continentalexpansion and contraction loosening joints
Galati218,000continentalexpansion and contraction loosening joints

Every one of the 26 listed cities has a continental climate, which keeps the choice of parts consistent from city to city.

Neighbouring supplies to check before ordering cables

Romania borders Moldova, Hungary, Ukraine, Bulgaria and Serbia. All of them use a nominal 230 V at 50 Hz, the same as Romania, so an electrical rating that fits one side of the border fits the other.

Size and settlement in Romania

At roughly 237,500 km², Romania is the 81st largest of the 241 countries covered by this directory, almost exactly the size of Laos (236,800 km²). Its 19.5 million people give an average of 82 per km². In this directory that is moderately settled, close to the middle of the directory for density. People and businesses cluster around the main cities, so say which city or region the delivery is for. Its population is similar to that of Burkina Faso (19.8 million).

Jobs in Romania that call for cables

In Romania, these are the jobs that most often call for cables:

  • Indoor-to-outdoor interconnecting cable for split ACs
  • Power supply to packaged and ducted units
  • Control panels and sub-distribution boards
  • Building refurbishment and retrofit work
  • Fan coil unit and VRF branch wiring

Klima cables models

ModelCoresConductor size (mm²)Insulation
Klima 3-Core Flexible Cable 1.5 mm²31.5PVC
Klima 3-Core Flexible Cable 2.5 mm²32.5PVC
Klima 3-Core Flexible Cable 4 mm²34PVC
Klima 4-Core Flexible Cable 1.5 mm²41.5PVC
Klima 4-Core Flexible Cable 2.5 mm²42.5PVC
Klima 4-Core Flexible Cable 4 mm²44PVC

See the full Klima Cables (3 & 4 Core) range for specifications, standards and a plain-language guide to choosing the right part.

Selecting cables in Romania

  • Use 4-core where the unit needs a communication or switched conductor, and 3-core for simple live-neutral-earth feeds.
  • Avoid splices inside walls; use terminal blocks in accessible enclosures.
  • Confirm the supply first: Romania uses 230 V at 50 Hz, so check the voltage and frequency rating of cables against the equipment nameplate.
  • Ask for the datasheet and the documents your project needs; in Romania that usually means CE marking, RoHS and, where relevant, the Pressure Equipment Directive (PED) and F-gas regulations.

Care and maintenance in Romania

  • Support outdoor runs with clips or conduit so the sheath does not chafe or sag.

In the northern hemisphere the busiest cooling months fall from June to August; April or May is a sensible time to check cables in Romania. Weak electrical parts show up first at the start of a hot spell; checking them beforehand avoids emergency call-outs.

Signs of trouble

  • Intermittent unit shutdowns caused by damaged conductors

Approvals for cables sold into Romania

Klima cables follow IEC 60227 and IEC 60245 (insulated flexible cables); in Romania expect CE marking, RoHS and, where relevant, the Pressure Equipment Directive (PED) and F-gas regulations as well. Request the datasheet and test documents with your enquiry so the paperwork is ready before the goods ship.

Getting cables to Romania

Cargo for Romania usually arrives through Constanta; tell us your preferred port or delivery address with your enquiry.

The local currency is the Leu (RON), so confirm the quotation currency and delivery terms before you order. The main languages are Romanian, Hungarian and Romany; this site and its enquiry form are in English.

Contractors and traders can ask for trade terms through the distributors page. See the distributors page.

Questions about cables in Romania

What is the difference between 3-core and 4-core cable?

3-core cable normally carries live, neutral and earth. 4-core adds a fourth conductor for communication or a switched supply, or carries three live phases plus earth on small three-phase equipment.

What voltage should cables be rated for in Romania?

Romania supplies 230 V at 50 Hz, the common 230/400 V, 50 Hz pattern, so cables rated for 230 V single-phase and 400 V three-phase equipment are the usual choice.

Which standards apply to cables in Romania?

Klima cables follow IEC 60227 and IEC 60245 (insulated flexible cables). In Romania the local framework is CE marking, RoHS and, where relevant, the Pressure Equipment Directive (PED) and F-gas regulations; request the datasheet and conformity documents with your enquiry.

How are cables delivered to Romania?

Sea freight into Romania normally clears through ports such as Constanta, with onward delivery by road; urgent parts can travel by air.

Which cities in Romania can I order cables for?

Every listed city is covered. The largest are Bucharest (1.9 million), Iasi (379,000), Constanta (318,000), Cluj-Napoca (287,000) and Brasov (253,000). The country page lists the rest.

Do the neighbours of Romania use the same mains supply?

Yes. All 5 listed neighbours (Moldova, Hungary, Ukraine, Bulgaria and Serbia) run on a nominal 230 V at 50 Hz, the same as Romania, so the electrical rating of a part does not usually change at the border.

What local time and daylight should I plan for in Romania?

Bucharest keeps UTC+2, moving to UTC+3 while daylight saving applies. At 44.4° N there are about 15 h 33 min of daylight in June and about 8 h 50 min in December.

More Klima products for Romania

Cables in cities across Romania