Klima Industries

Taiwan: Klima Cables (3 & 4 Core)

With about 23.5 million people, Taiwan is a mid-sized market in Asia. Its capital is Taipei. The prevailing climate is humid subtropical, though conditions differ between regions. Summers are hot and humid, with heavy seasonal rain, while winters are cooler and milder.

Demand for cables comes mostly from offices, shops and malls as well as factories and workshops. The Klima range includes 6 models, each with a specification table; send an enquiry from Taiwan for a quotation.

Capital
Taipei
Population
23.5 million
Area
35,980 km²
Time zone
UTC+8 all year
Climate
Humid subtropical
Supply
110 V, 60 Hz
Main ports
Kaohsiung Port, Keelung Port
Standards
BSMI requirements for regulated products

Klima Cables (3 & 4 Core) models

All Klima products for Taiwan · Klima Cables (3 & 4 Core) overview

Cables and the climate in Taiwan

In Taiwan, cooling demand peaks through a long, humid summer. High humidity brings condensation and terminal corrosion, so favour insulated, well-sealed cables and keep control boxes closed with their gaskets intact.

Heat is the main enemy of electrical parts here: cables run hotter in outdoor units, so choose a higher temperature class and some rating margin, and re-check terminal tightness before each cooling season.

The supply in Taiwan is 110 V, 60 Hz. Residential units usually run on split-phase and commercial plant on three-phase, so confirm the voltage and phase before choosing a cable.

Cities that buy cables in Taiwan

The three largest listed cities (Taipei, New Taipei City and Taichung) hold about 69% of the people living in listed cities, which means a few centres do most of the buying. From Jincheng to Hengchun, the longest straight-line gap between listed cities is about 367 km; which keeps most road deliveries inside a day. These are the biggest listed cities in Taiwan; the last column names what to watch for in cables there.

CityPeopleClimateWhat wears cables first
Taipei7.9 millionhumid subtropicalmoisture on terminals and corrosion
New Taipei City4 millionhumid subtropicalmoisture on terminals and corrosion
Taichung2.9 millionhumid subtropicalterminals loosening and parts running hot
Kaohsiung2.7 millionhot and humid tropicalmoisture on terminals and corrosion
Zhubei213,000humid subtropicalterminals loosening and parts running hot
Nantou106,000humid subtropicalterminals loosening and parts running hot

Time zone, sun and daylight in Taiwan

The clock in Taipei follows UTC+8 all year.

At 25.1° N, Taipei has about 13 h 42 min of daylight at the June solstice and about 10 h 35 min at the December solstice. The noon sun stands 88° above the horizon in June and 42° in December, and the sun climbs almost to the zenith, so outdoor units on roofs and in open yards take the full load of its heat.

Typical uses of cables in Taiwan

Typical work in Taiwan that needs cables:

  • Fan coil unit and VRF branch wiring
  • Indoor-to-outdoor interconnecting cable for split ACs
  • Power supply to packaged and ducted units
  • Pump, fan and compressor motor connections
  • Building refurbishment and retrofit work

Klima cables models

ModelCoresConductor size (mm²)Insulation
Klima 3-Core Flexible Cable 1.5 mm²31.5PVC
Klima 3-Core Flexible Cable 2.5 mm²32.5PVC
Klima 3-Core Flexible Cable 4 mm²34PVC
Klima 4-Core Flexible Cable 1.5 mm²41.5PVC
Klima 4-Core Flexible Cable 2.5 mm²42.5PVC
Klima 4-Core Flexible Cable 4 mm²44PVC

See the full Klima Cables (3 & 4 Core) range for specifications, standards and a plain-language guide to choosing the right part.

How to pick cables for work in Taiwan

  • Size the conductor from the unit's maximum running current and the cable length, and check that voltage drop stays within the limit in your local wiring rules.
  • Avoid splices inside walls; use terminal blocks in accessible enclosures.
  • Confirm the supply first: Taiwan uses 110 V at 60 Hz, so check the voltage and frequency rating of cables against the equipment nameplate.
  • For humid subtropical conditions in Taiwan, favour sealed, corrosion-resistant construction.

Care and maintenance in Taiwan

  • Support outdoor runs with clips or conduit so the sheath does not chafe or sag.

Because Taiwan is in the northern hemisphere, the heaviest cooling load normally falls from June to September. Service cables in April or May, while the load is still light. Electrical parts fail most often when the load is highest, so retighten and test before the peak.

Signs of trouble

  • Discoloured or brittle sheathing near hot refrigerant lines

Standards and paperwork for cables in Taiwan

Klima cables follow IEC 60227 and IEC 60245 (insulated flexible cables); in Taiwan expect BSMI requirements for regulated products as well. Request the datasheet and test documents with your enquiry so the paperwork is ready before the goods ship.

Supply and delivery to Taiwan

Sea freight into Taiwan normally clears through ports such as Kaohsiung Port and Keelung Port, with onward delivery by road; urgent parts can travel by air.

The local currency is the Dollar (TWD), so confirm the quotation currency and delivery terms before you order. The main languages are Chinese, Min Nan Chinese and Hakka Chinese; this site and its enquiry form are in English.

Wholesalers and installers who buy regularly can ask about trade terms. See the distributors page.

Questions about cables in Taiwan

Should I use flexible or solid cable?

Flexible stranded cable suits equipment connections and conduit pulls. Solid conductor is common in fixed wiring but harder to terminate at unit terminals.

What voltage should cables be rated for in Taiwan?

Equipment in Taiwan runs from 110 V at 60 Hz; make sure the cable you choose carries the right voltage and frequency rating for 60 Hz operation.

Which standards apply to cables in Taiwan?

Klima cables follow IEC 60227 and IEC 60245 (insulated flexible cables). In Taiwan the local framework is BSMI requirements for regulated products; request the datasheet and conformity documents with your enquiry.

How are cables delivered to Taiwan?

Cargo for Taiwan usually arrives through Kaohsiung Port and Keelung Port; tell us your preferred port or delivery address with your enquiry.

Which cities in Taiwan can I order cables for?

Every listed city is covered. The largest are Taipei (7.9 million), New Taipei City (4 million), Taichung (2.9 million), Kaohsiung (2.7 million) and Tainan (1.9 million). The country page lists the rest.

What local time and daylight should I plan for in Taiwan?

Taipei keeps UTC+8 all year. At 25.1° N there are about 13 h 42 min of daylight in June and about 10 h 35 min in December.

More Klima products for Taiwan

Cables in cities across Taiwan