Klima Copper Coils & Tubes supplied to Cameroon
Home to about 25.2 million people, Cameroon sits in Africa. Its capital is Yaounde. Most of the country has a hot and humid tropical climate, and conditions vary by region. Temperatures stay high all year, typically from the high 20s to the mid 30s °C, with humidity often above 75 %.
The main users of copper coils and tubes in Cameroon are offices, shops and malls, homes and apartments as well as hospitals and clinics. Klima Industries lists 6 models in this range with full specifications below, and enquiries from Cameroon are welcome.
- Capital
- Yaounde
- Population
- 25.2 million
- Area
- 475,440 km²
- Time zone
- UTC+1 all year
- Climate
- Hot and humid tropical
- Supply
- 230 V, 50 Hz
- Main ports
- Douala
- Standards
- ANOR (Standards and Quality Agency) requirements
Klima Copper Coils & Tubes models
- Klima Soft Copper Coil 1/4 in (6.35 mm), 0.8 mm Wall Size: 1/4 in, Outside diameter: 6.35 mm, Wall thickness: 0.8 mm
- Klima Soft Copper Coil 3/8 in (9.52 mm), 0.8 mm Wall Size: 3/8 in, Outside diameter: 9.52 mm, Wall thickness: 0.8 mm
- Klima Soft Copper Coil 1/2 in (12.7 mm), 0.8 mm Wall Size: 1/2 in, Outside diameter: 12.7 mm, Wall thickness: 0.8 mm
- Klima Soft Copper Coil 5/8 in (15.88 mm), 1.0 mm Wall Size: 5/8 in, Outside diameter: 15.88 mm, Wall thickness: 1.0 mm
- Klima Soft Copper Coil 3/4 in (19.05 mm), 1.0 mm Wall Size: 3/4 in, Outside diameter: 19.05 mm, Wall thickness: 1.0 mm
- Klima Soft Copper Coil 7/8 in (22.2 mm), 1.0 mm Wall Size: 7/8 in, Outside diameter: 22.2 mm, Wall thickness: 1.0 mm
All Klima products for Cameroon · Klima Copper Coils & Tubes overview
Copper coils and tubes and the climate in Cameroon
In Cameroon, cooling and refrigeration work in every month of the year. Every minute an open circuit spends in humid air adds moisture, which turns into acid in the oil; fit new copper coils and tubes last and keep the system closed until you are ready to evacuate.
Rooftop copper can already be hot to the touch before you light the torch; shade the work, keep copper coils and tubes cool and heat evenly to avoid overheating the joint.
Where copper coils and tubes are needed in Cameroon
The capital is Yaounde, but the biggest listed city is Douala, about 202 km away to the west of it; quote the delivery city on every enquiry. The three largest listed cities (Douala, Yaounde and Bamenda) hold about 48% of the people living in listed cities, which means demand is shared between a few large centres and many smaller cities. These are the biggest listed cities in Cameroon; the last column names what to watch for in copper coils and tubes there.
| City | People | Climate | What wears copper coils and tubes first |
|---|---|---|---|
| Douala | 1.3 million | hot and humid tropical | high head pressure and hot joints |
| Yaounde | 1.3 million | hot and humid tropical | moisture entering the circuit and corrosion |
| Bamenda | 420,000 | hot and humid tropical | moisture entering the circuit and corrosion |
| Bafoussam | 373,000 | hot and humid tropical | moisture entering the circuit and corrosion |
| Maroua | 314,000 | hot and humid tropical | moisture entering the circuit and corrosion |
| Nkongsamba | 162,000 | hot and humid tropical | moisture entering the circuit and corrosion |
Every one of the 28 listed cities has a hot and humid tropical climate, which keeps the choice of parts consistent from city to city.
How large is Cameroon, and how is it settled?
The directory puts Cameroon at about 475,440 km², the 54th largest of its 241 countries, a little smaller than Turkmenistan (488,100 km²). With 25.2 million residents the average density is 53 per km², so Cameroon counts as moderately settled, sparser than 65% of the other countries in this directory. Settlement clusters around the main cities with long gaps between them, so name the city or region when you order. For scale, Ivory Coast has a similar number of people (25.1 million).
The sun and the clock in Cameroon
The clock in Yaounde follows UTC+1 all year.
Sunlight at 3.9° N (Yaounde): about 12 h 21 min of daylight in June, about 11 h 54 min in December, and a noon sun that reaches 70° in June and 63° in December. The sun climbs high in summer, so shade and ventilation around outdoor units matter.
Jobs in Cameroon that call for copper coils and tubes
Typical work in Cameroon that needs copper coils and tubes:
- Marine and offshore refrigeration
- Split-system liquid and suction lines
- VRF and multi-split branch piping
- Heat pump refrigerant lines
- Display cabinets and ice machines
Klima copper coils and tubes models
| Model | Size (in) | Outside diameter (mm) | Wall thickness (mm) |
|---|---|---|---|
| Klima Soft Copper Coil 1/4 in (6.35 mm), 0.8 mm Wall | 1/4 in | 6.35 | 0.8 |
| Klima Soft Copper Coil 3/8 in (9.52 mm), 0.8 mm Wall | 3/8 in | 9.52 | 0.8 |
| Klima Soft Copper Coil 1/2 in (12.7 mm), 0.8 mm Wall | 1/2 in | 12.7 | 0.8 |
| Klima Soft Copper Coil 5/8 in (15.88 mm), 1.0 mm Wall | 5/8 in | 15.88 | 1.0 |
| Klima Soft Copper Coil 3/4 in (19.05 mm), 1.0 mm Wall | 3/4 in | 19.05 | 1.0 |
| Klima Soft Copper Coil 7/8 in (22.2 mm), 1.0 mm Wall | 7/8 in | 22.2 | 1.0 |
See the full Klima Copper Coils & Tubes range for specifications, standards and a plain-language guide to choosing the right part.
How to pick copper coils and tubes for work in Cameroon
- Use soft coils for bends and flare connections, and hard-drawn straight tube where the pipe must stay rigid.
- Match outside diameter to the service connections on the indoor and outdoor units, and do not mix imperial and metric sizes without adaptors.
- For hot and humid tropical conditions in Cameroon, favour sealed, corrosion-resistant construction.
- Ask for the datasheet and the documents your project needs; in Cameroon that usually means ANOR (Standards and Quality Agency) requirements.
Keeping copper coils and tubes reliable in Cameroon
- Keep pipe ends capped until the moment of brazing so moisture and dirt stay out.
With little seasonal change in temperature, air conditioning in Cameroon works almost every day. Spread checks of copper coils and tubes through the year instead of waiting for a peak. Replace driers and re-braze suspect joints while the system can be stopped without complaints.
Faults to watch for
- A system that loses charge slowly
Standards and paperwork for copper coils and tubes in Cameroon
Klima copper coils and tubes are specified against EN 12735-1 and ASTM B280 (copper tube for refrigeration and air conditioning). For import and installation in Cameroon, buyers also meet ANOR (Standards and Quality Agency) requirements. Ask for the datasheet and conformity documents for the Klima model you plan to specify, so that submittals and import paperwork are complete.
Ordering copper coils and tubes for Cameroon
Cargo for Cameroon usually arrives through Douala; tell us your preferred port or delivery address with your enquiry.
The local currency is the Franc (XAF), so confirm the quotation currency and delivery terms before you order. The main languages are English and French; this site and its enquiry form are in English.
Wholesalers and installers who buy regularly can ask about trade terms. See the distributors page.
Questions about copper coils and tubes in Cameroon
How do I join copper tube?
By brazing with a suitable filler rod and flux where required, or by flare and compression fittings on small sizes. Always purge with nitrogen while brazing and pressure test afterwards.
How does the climate in Cameroon affect copper coils and tubes?
Humid air makes moisture ingress the biggest installation risk, so keep copper coils and tubes sealed until use, braze under nitrogen and evacuate to a deep vacuum before charging.
Which standards apply to copper coils and tubes in Cameroon?
Klima copper coils and tubes follow EN 12735-1 and ASTM B280 (copper tube for refrigeration and air conditioning). In Cameroon the local framework is ANOR (Standards and Quality Agency) requirements; request the datasheet and conformity documents with your enquiry.
How are copper coils and tubes delivered to Cameroon?
Sea freight into Cameroon normally clears through ports such as Douala, with onward delivery by road; urgent parts can travel by air.
Which cities in Cameroon can I order copper coils and tubes for?
Every listed city is covered. The largest are Douala (1.3 million), Yaounde (1.3 million), Bamenda (420,000), Bafoussam (373,000) and Maroua (314,000). The country page lists the rest.
What local time and daylight should I plan for in Cameroon?
Yaounde keeps UTC+1 all year. At 3.9° N there are about 12 h 21 min of daylight in June and about 11 h 54 min in December.
More Klima products for Cameroon
- Klima Filter Driers in Cameroon
- Klima Flux Powder (100 g & 250 g) in Cameroon
- Klima Map Gas (Brazing & Welding) in Cameroon
- Klima Thermometers for HVAC in Cameroon
- Klima Condensate Pump in Cameroon
- Klima Delay on Make Timer in Cameroon
Copper coils and tubes in cities across Cameroon
- Klima Copper Coils & Tubes in Yaounde
- Klima Copper Coils & Tubes in Douala
- Klima Copper Coils & Tubes in Bamenda
- Klima Copper Coils & Tubes in Bafoussam
- Klima Copper Coils & Tubes in Maroua
- Klima Copper Coils & Tubes in Ngaoundere
- Klima Copper Coils & Tubes in Kumba
- Klima Copper Coils & Tubes in Nkongsamba