Buying copper coils and tubes in DR Congo
With about 84.1 million people, DR Congo is a large national market in Africa. Its capital is Kinshasa. Most of the country has a hot and humid tropical climate, and conditions vary by region. Temperatures stay high all year, typically from the high 20s to the mid 30s °C, with humidity often above 75 %.
Copper coils and tubes are bought here mainly for offices, shops and malls as well as factories and workshops. Klima Industries lists 6 models in this range with full specifications below, and enquiries from DR Congo are welcome.
- Capital
- Kinshasa
- Population
- 84.1 million
- Area
- 2,345,410 km²
- Time zone
- UTC+1 all year
- Climate
- Hot and humid tropical
- Supply
- 230 V, 50 Hz
- Main ports
- Matadi, Boma
- Standards
- OCC (Office Congolais de Controle) inspection and conformity requirements
Klima Copper Coils & Tubes models
- Klima Soft Copper Coil 1/4 in (6.35 mm), 0.8 mm Wall Size: 1/4 in, Outside diameter: 6.35 mm, Wall thickness: 0.8 mm
- Klima Soft Copper Coil 3/8 in (9.52 mm), 0.8 mm Wall Size: 3/8 in, Outside diameter: 9.52 mm, Wall thickness: 0.8 mm
- Klima Soft Copper Coil 1/2 in (12.7 mm), 0.8 mm Wall Size: 1/2 in, Outside diameter: 12.7 mm, Wall thickness: 0.8 mm
- Klima Soft Copper Coil 5/8 in (15.88 mm), 1.0 mm Wall Size: 5/8 in, Outside diameter: 15.88 mm, Wall thickness: 1.0 mm
- Klima Soft Copper Coil 3/4 in (19.05 mm), 1.0 mm Wall Size: 3/4 in, Outside diameter: 19.05 mm, Wall thickness: 1.0 mm
- Klima Soft Copper Coil 7/8 in (22.2 mm), 1.0 mm Wall Size: 7/8 in, Outside diameter: 22.2 mm, Wall thickness: 1.0 mm
All Klima products for DR Congo · Klima Copper Coils & Tubes overview
Copper coils and tubes and the climate in DR Congo
In DR Congo, cooling and refrigeration work in every month of the year. Every minute an open circuit spends in humid air adds moisture, which turns into acid in the oil; fit new copper coils and tubes last and keep the system closed until you are ready to evacuate.
Hot ambient air shortens heating time but dries flux paste quickly, so mix only what you need and keep the tub shaded and closed between joints.
Copper coils and tubes across the cities of DR Congo
The widest gap between listed cities runs from Bunia to Moanda, about 2,153 km, which means days by road between the far ends, with air freight used for urgent parts. Together Kinshasa, Lubumbashi and Mbuji-Mayi account for roughly 61% of the population of all listed cities, so a few centres do most of the buying. Climate decides how copper coils and tubes age, and it changes from city to city in DR Congo: the last column shows what to expect.
| City | People | Climate | What wears copper coils and tubes first |
|---|---|---|---|
| Kinshasa | 16 million | hot and humid tropical | moisture entering the circuit and corrosion |
| Lubumbashi | 2.2 million | hot and humid tropical | high head pressure and hot joints |
| Mbuji-Mayi | 2.1 million | hot and humid tropical | high head pressure and hot joints |
| Bukavu | 817,000 | highland | joint fatigue from temperature swings |
| Kolwezi | 790,000 | hot and humid tropical | high head pressure and hot joints |
| Likasi | 636,000 | hot and humid tropical | high head pressure and hot joints |
Climate changes from city to city: of the 45 listed cities, 44 hot and humid tropical and 1 highland, so spares chosen for one city may not suit another.
The sun and the clock in DR Congo
The clock in Kinshasa follows UTC+1 all year. The listed cities of DR Congo fall in 2 standard time zones, from UTC+1 to UTC+2, so a delivery cut-off depends on where the order is going.
Sunlight at 4.3° S (Kinshasa): about 11 h 52 min of daylight in June, about 12 h 22 min in December, and a noon sun that reaches 62° in June and 71° in December. The sun climbs high in summer, so shade and ventilation around outdoor units matter.
Size and settlement in DR Congo
The directory puts DR Congo at about 2,345,410 km², the 11th largest of its 241 countries, a little smaller than Algeria (2,381,740 km²). Population density averages 36 people per km² across 84.1 million residents, which is moderately settled and sparser than 74% of the other countries in this directory. Settlement clusters around the main cities with long gaps between them, so name the city or region when you order. For scale, Germany has a similar number of people (82.9 million).
Jobs in DR Congo that call for copper coils and tubes
Typical work in DR Congo that needs copper coils and tubes:
- VRF and multi-split branch piping
- Heat pump refrigerant lines
- Replacement coils and repair sections
- Split-system liquid and suction lines
- Chiller and package unit refrigerant circuits
Klima copper coils and tubes models
| Model | Size (in) | Outside diameter (mm) | Wall thickness (mm) |
|---|---|---|---|
| Klima Soft Copper Coil 1/4 in (6.35 mm), 0.8 mm Wall | 1/4 in | 6.35 | 0.8 |
| Klima Soft Copper Coil 3/8 in (9.52 mm), 0.8 mm Wall | 3/8 in | 9.52 | 0.8 |
| Klima Soft Copper Coil 1/2 in (12.7 mm), 0.8 mm Wall | 1/2 in | 12.7 | 0.8 |
| Klima Soft Copper Coil 5/8 in (15.88 mm), 1.0 mm Wall | 5/8 in | 15.88 | 1.0 |
| Klima Soft Copper Coil 3/4 in (19.05 mm), 1.0 mm Wall | 3/4 in | 19.05 | 1.0 |
| Klima Soft Copper Coil 7/8 in (22.2 mm), 1.0 mm Wall | 7/8 in | 22.2 | 1.0 |
See the full Klima Copper Coils & Tubes range for specifications, standards and a plain-language guide to choosing the right part.
How to pick copper coils and tubes for work in DR Congo
- Use soft coils for bends and flare connections, and hard-drawn straight tube where the pipe must stay rigid.
- Choose wall thickness for the refrigerant: R410A and R32 need heavier walls than R22 or R134a.
- Ask for the datasheet and the documents your project needs; in DR Congo that usually means OCC (Office Congolais de Controle) inspection and conformity requirements.
- For hot and humid tropical conditions in DR Congo, favour sealed, corrosion-resistant construction.
Care and maintenance in DR Congo
- Braze with a nitrogen purge to prevent internal oxide scale, then pressure test and evacuate before charging.
With little seasonal change in temperature, air conditioning in DR Congo works almost every day. Spread checks of copper coils and tubes through the year instead of waiting for a peak. Replace driers and re-braze suspect joints while the system can be stopped without complaints.
Signs of trouble
- A system that loses charge slowly
Approvals for copper coils and tubes sold into DR Congo
Klima copper coils and tubes are specified against EN 12735-1 and ASTM B280 (copper tube for refrigeration and air conditioning). For import and installation in DR Congo, buyers also meet OCC (Office Congolais de Controle) inspection and conformity requirements. Ask for the datasheet and conformity documents for the Klima model you plan to specify, so that submittals and import paperwork are complete.
Ordering copper coils and tubes for DR Congo
Sea freight into DR Congo normally clears through ports such as Matadi and Boma, with onward delivery by road; urgent parts can travel by air.
The local currency is the Franc (CDF), so confirm the quotation currency and delivery terms before you order. The main languages are French, Lingala, Kituba and Kongo; this site and its enquiry form are in English.
Contractors and traders can ask for trade terms through the distributors page. See the distributors page.
Questions about copper coils and tubes in DR Congo
What is the difference between a pancake coil and straight tube?
A pancake coil is soft-annealed tube wound flat in a level spiral for easy bending on site. Straight lengths are usually supplied in hard temper for rigid, fixed pipework.
How does the climate in DR Congo affect copper coils and tubes?
Humid air makes moisture ingress the biggest installation risk, so keep copper coils and tubes sealed until use, braze under nitrogen and evacuate to a deep vacuum before charging.
Which standards apply to copper coils and tubes in DR Congo?
Klima copper coils and tubes follow EN 12735-1 and ASTM B280 (copper tube for refrigeration and air conditioning). In DR Congo the local framework is OCC (Office Congolais de Controle) inspection and conformity requirements; request the datasheet and conformity documents with your enquiry.
How are copper coils and tubes delivered to DR Congo?
Cargo for DR Congo usually arrives through Matadi and Boma; tell us your preferred port or delivery address with your enquiry.
Which cities in DR Congo can I order copper coils and tubes for?
Every listed city is covered. The largest are Kinshasa (16 million), Lubumbashi (2.2 million), Mbuji-Mayi (2.1 million), Kananga (1.2 million) and Kisangani (1.2 million). The country page lists the rest.
What local time and daylight should I plan for in DR Congo?
Kinshasa keeps UTC+1 all year. At 4.3° S there are about 11 h 52 min of daylight in June and about 12 h 22 min in December.
More Klima products for DR Congo
- Klima Filter Driers in DR Congo
- Klima Flux Powder (100 g & 250 g) in DR Congo
- Klima Map Gas (Brazing & Welding) in DR Congo
- Klima Temperature Controllers in DR Congo
- Klima Drier Core 48-KL in DR Congo
- Klima Pressure Switches (High & Low) in DR Congo
Copper coils and tubes in cities across DR Congo
- Klima Copper Coils & Tubes in Kinshasa
- Klima Copper Coils & Tubes in Lubumbashi
- Klima Copper Coils & Tubes in Mbuji-Mayi
- Klima Copper Coils & Tubes in Kananga
- Klima Copper Coils & Tubes in Kisangani
- Klima Copper Coils & Tubes in Bukavu
- Klima Copper Coils & Tubes in Kolwezi
- Klima Copper Coils & Tubes in Likasi