Klima Industries

Delay on make timers supply in Israel

Israel is a mid-sized market in Asia, and its capital is Jerusalem. The climate across Israel is Mediterranean, with only modest differences from one place to another. Summers are hot and dry, with long spells above 30 °C, and winters are mild and wetter.

Demand for delay on make timers comes mostly from offices, shops and malls, hospitals and clinics as well as cold stores and food distribution. The Klima range includes 4 models, each with a specification table; send an enquiry from Israel for a quotation.

Capital
Jerusalem
Population
8.9 million
Area
20,770 km²
Time zone
UTC+2, moving to UTC+3 while daylight saving applies
Climate
Mediterranean
Supply
230 V, 50 Hz
Main ports
Haifa Port, Ashdod Port
Standards
SII (Standards Institution of Israel) requirements

Klima Delay on Make Timer models

All Klima products for Israel · Klima Delay on Make Timer overview

Delay on make timers and the climate in Israel

In Israel, cooling demand peaks from late spring to early autumn. Outdoor units sit in direct sun, which raises component temperatures well above the air temperature; delay on make timers with generous ratings and secure terminations last longer than parts chosen to the bare nameplate value.

Wide temperature variation makes differentials matter; recheck the setting of delay on make timers so that the compressor does not short-cycle.

Israel supplies 230 V at 50 Hz, the common 230/400 V, 50 Hz pattern, so delay on make timers rated for 230 V single-phase and 400 V three-phase equipment are the usual choice.

Delay on make timers across the cities of Israel

The widest gap between listed cities runs from Beersheba to Nahariyya, about 198 km, which keeps most road deliveries inside a day. The three largest listed cities (Jerusalem, Tel Aviv and West Jerusalem) hold about 40% of the people living in listed cities, which means demand is spread across many cities. These are the biggest listed cities in Israel; the last column names what to watch for in delay on make timers there.

CityPeopleClimateWhat wears delay on make timers first
Jerusalem972,000Mediterraneancalibration drift between seasons
Tel Aviv433,000Mediterraneansensor drift and setpoints creeping
West Jerusalem400,000Mediterraneancalibration drift between seasons
Netanya228,000Mediterraneancalibration drift between seasons
Ashdod227,000Mediterraneancalibration drift between seasons
Holon196,000Mediterraneancalibration drift between seasons

How large is Israel, and how is it settled?

Israel covers about 20,770 km², the 88th smallest of the 241 countries in this directory, almost exactly the size of El Salvador (21,040 km²). Its 8.9 million people give an average of 428 per km². In this directory that is very densely settled, denser than 89% of the other countries in this directory. Sites are close together, so one delivery can often serve several customers in the same trip. Its population is similar to that of Austria (8.8 million).

Voltage next door: Israel and its neighbours

Across the border, Syria, Jordan, Lebanon, Egypt and Palestine also run on a nominal 230 V at 50 Hz, so ratings carry over between Israel and its neighbours; the nameplate of the equipment still decides.

Jobs in Israel that call for delay on make timers

Delay on make timers are most often specified in Israel for:

  • Refrigerated trucks and containers
  • Split and ducted air conditioners
  • Cold rooms and refrigeration condensing units
  • Rooftop packaged units
  • Chiller control panels

Klima delay on make timers models

ModelSupply voltage (V)Delay rangeContact rating (A)
Klima Delay on Make Timer, Fixed, 24 V AC/DC24 V AC/DC3 min fixed5
Klima Delay on Make Timer, Fixed, 230 V AC230 V AC3 min fixed5
Klima Delay on Make Timer, Adjustable, 24 V AC/DC24 V AC/DC0.1 to 10 min5
Klima Delay on Make Timer, Adjustable, 230 V AC230 V AC0.1 to 10 min5

See the full Klima Delay on Make Timer range for specifications, standards and a plain-language guide to choosing the right part.

How to pick delay on make timers for work in Israel

  • Choose an adjustable delay when one timer must serve several equipment types.
  • Set the delay to the compressor maker's recommended off-time; three to five minutes is typical for hermetic compressors.
  • Confirm the supply first: Israel uses 230 V at 50 Hz, so check the voltage and frequency rating of delay on make timers against the equipment nameplate.
  • For Mediterranean conditions in Israel, favour higher temperature ratings and some margin on every rated value.

Keeping delay on make timers reliable in Israel

  • Test the delay after installation by cycling the thermostat and timing the restart.

In the northern hemisphere the busiest cooling months fall from June to September; April or May is a sensible time to check delay on make timers in Israel. Checking setpoints and safety cut-outs in a quiet week is simpler than doing it during a heatwave.

Faults to watch for

  • Repeated overload trips or clicking contactors

Approvals for delay on make timers sold into Israel

Two sets of rules apply to delay on make timers sold into Israel: the product standard, IEC 61812-1 (time relays), and the local one, SII (Standards Institution of Israel) requirements. Importers and consultants normally ask for datasheets and test documents, so request them with the enquiry.

Supply and delivery to Israel

Sea freight into Israel normally clears through ports such as Haifa Port and Ashdod Port, with onward delivery by road; urgent parts can travel by air.

The local currency is the Shekel (ILS), so confirm the quotation currency and delivery terms before you order. The main languages are Hebrew, Arabic and English; this site and its enquiry form are in English.

Contractors and traders can ask for trade terms through the distributors page. See the distributors page.

Questions about delay on make timers in Israel

How long should the delay be?

Follow the compressor manufacturer's guidance. Around three to five minutes is common for hermetic air conditioning and refrigeration compressors.

What voltage should delay on make timers be rated for in Israel?

The mains supply in Israel is 230 V, 50 Hz. Match delay on make timers to that voltage class and confirm whether the equipment is single-phase or three-phase before you order.

Which standards apply to delay on make timers in Israel?

Klima delay on make timers follow IEC 61812-1 (time relays). In Israel the local framework is SII (Standards Institution of Israel) requirements; request the datasheet and conformity documents with your enquiry.

How are delay on make timers delivered to Israel?

Cargo for Israel usually arrives through Haifa Port and Ashdod Port; tell us your preferred port or delivery address with your enquiry.

Which cities in Israel can I order delay on make timers for?

Every listed city is covered. The largest are Jerusalem (972,000), Tel Aviv (433,000), West Jerusalem (400,000), Haifa (285,000) and Rishon LeTsiyyon (259,000). The country page lists the rest.

Do the neighbours of Israel use the same mains supply?

Yes. All 5 listed neighbours (Syria, Jordan, Lebanon, Egypt and Palestine) run on a nominal 230 V at 50 Hz, the same as Israel, so the electrical rating of a part does not usually change at the border.

What local time and daylight should I plan for in Israel?

Jerusalem keeps UTC+2, moving to UTC+3 while daylight saving applies. At 31.8° N there are about 14 h 13 min of daylight in June and about 10 h 04 min in December.

More Klima products for Israel

Delay on make timers in cities across Israel