Magway: Klima Delay on Make Timer
Found in Myanmar, Magway is a smaller city with a hot and humid tropical climate. Temperatures stay high all year, typically from the high 20s to the mid 30s °C, with humidity often above 75 %.
Demand for delay on make timers comes mostly from offices, shops and malls, factories and workshops as well as hospitals and clinics. The range below has 4 models; send an enquiry with the model code and your delivery address in Magway.
- Country
- Myanmar
- Population
- 97,000
- Climate
- Hot and humid tropical
- Coordinates
- 20.1° N, 94.9° E
- Time zone
- UTC+6:30 all year
- Supply
- 230 V, 50 Hz
Klima Delay on Make Timer models
- Klima Delay on Make Timer, Fixed, 24 V AC/DC Supply voltage: 24 V AC/DC, Delay range: 3 min fixed, Contact rating: 5 A
- Klima Delay on Make Timer, Fixed, 230 V AC Supply voltage: 230 V AC, Delay range: 3 min fixed, Contact rating: 5 A
- Klima Delay on Make Timer, Adjustable, 24 V AC/DC Supply voltage: 24 V AC/DC, Delay range: 0.1 to 10 min, Contact rating: 5 A
- Klima Delay on Make Timer, Adjustable, 230 V AC Supply voltage: 230 V AC, Delay range: 0.1 to 10 min, Contact rating: 5 A
All Klima products for Magway · Klima Delay on Make Timer overview
Delay on make timers and the climate in Magway
In Magway, cooling and refrigeration work in every month of the year. Damp air can track across dirty or unprotected connections; fit delay on make timers with proper insulation and boots, and treat green corrosion on terminals as a reason to replace the part.
In very hot weather a badly placed control keeps the compressor running; mount delay on make timers out of direct sun and away from heat sources.
Delay on make timers in Magway and the cities near it
Magway ranks 32nd of the 37 listed cities in Myanmar and holds about 0.8% of the people living in them, about 2.2% of the size of Yangon, the largest. For scale, Tumbes in Peru has a similar population (97,000).
Nearest to Magway: Yenangyaung (36 km north), Chauk (84 km north) and Thayetmyo (96 km south). Four other listed cities lie within 100 km, and 20 within 300 km. At the other extreme, Myeik is about 942 km south-east of Magway, the furthest listed city in Myanmar.
| City | Distance | People | What wears delay on make timers first |
|---|---|---|---|
| Yenangyaung | 36 km north | 111,000 | sensor drift and setpoints creeping |
| Chauk | 84 km north | 91,000 | condensation inside enclosures |
| Thayetmyo | 96 km south | 98,000 | condensation inside enclosures |
| Ann | 100 km south-west | 120,000 | condensation inside enclosures |
| Meiktila | 126 km north-east | 177,000 | sensor drift and setpoints creeping |
| Nay Pyi Taw | 133 km east | 925,000 | sensor drift and setpoints creeping |
In a smaller city like Magway, a replacement control can mean a long wait. Keep a spare for critical equipment and check that the range matches the original.
Daylight and sun angle in Magway
Local time in Magway is UTC+6:30 all year.
Sunlight at 20.1° N (Magway): about 13 h 21 min of daylight in June, about 10 h 55 min in December, and a noon sun that reaches 87° in June and 46° in December. At its highest the sun stands almost overhead, so roof-mounted condensing units take its full heat for much of the day. Magway has a hot and humid tropical climate, the same as the country as a whole, and 34 other listed cities share it.
Where delay on make timers are used in Magway
Delay on make timers are most often specified in Magway for:
- Rooftop packaged units
- Split and ducted air conditioners
- Chiller control panels
Klima delay on make timers models
| Model | Supply voltage (V) | Delay range | Contact rating (A) |
|---|---|---|---|
| Klima Delay on Make Timer, Fixed, 24 V AC/DC | 24 V AC/DC | 3 min fixed | 5 |
| Klima Delay on Make Timer, Fixed, 230 V AC | 230 V AC | 3 min fixed | 5 |
| Klima Delay on Make Timer, Adjustable, 24 V AC/DC | 24 V AC/DC | 0.1 to 10 min | 5 |
| Klima Delay on Make Timer, Adjustable, 230 V AC | 230 V AC | 0.1 to 10 min | 5 |
See the full Klima Delay on Make Timer range for specifications, standards and a plain-language guide to choosing the right part.
How to pick delay on make timers for work in Magway
- Match the supply voltage to the control circuit; 24 V AC is common on thermostat circuits.
- For hot and humid tropical conditions in Magway, favour sealed, corrosion-resistant construction.
Care and maintenance in Magway
- Test the delay after installation by cycling the thermostat and timing the restart.
A tropical climate keeps cooling demand steady through the year in Magway, so there is no quiet season. Schedule checks of delay on make timers around the main rainy-season changes and keep spares on hand. Calibrate and test controls under easy conditions so settings are proven before the load rises.
Signs of trouble
- No restart at all after the delay period has passed
Ordering delay on make timers for Magway
To order delay on make timers for Magway, give a delivery address or a collection point in your enquiry, and mention whether road, sea or air delivery suits the job.
National rules, standards and voltage for Myanmar are summarised on the country page.
Wholesalers and installers who buy regularly can ask about trade terms. See the distributors page.
Questions about delay on make timers in Magway
Why do compressors need a delay?
Immediately after shutdown the high and low side pressures are still unequal, so a restart is difficult and can overload the motor.
What voltage should delay on make timers be rated for in Magway?
With a 230 V, 50 Hz supply, Myanmar follows the standard 230/400 V, 50 Hz arrangement; check the rated voltage on every delay on make timer against the equipment it serves.
How are delay on make timers delivered to Magway?
Shipments for Magway normally clear customs at one of the main entry points of Myanmar and finish the journey by road; send your delivery address with the enquiry.
Which parts of Magway can I order for?
Enquiries are welcome from every part of Magway. Send the delivery address with your enquiry.
Which cities near Magway can the same order serve?
The listed cities closest to Magway are Yenangyaung (36 km north), Chauk (84 km north) and Thayetmyo (96 km south). Combine them into one order and give each delivery address.
What local time and daylight should I plan for in Magway?
Magway keeps UTC+6:30 all year. At 20.1° N there are about 13 h 21 min of daylight in June and about 10 h 55 min in December.
More Klima products for Magway
- Klima Contactors in Magway
- Klima Thermostats in Magway
- Klima Transformer for HVAC in Magway
- Klima Copper Coils & Tubes in Magway
- Klima Pressure Switches (High & Low) in Magway
- Klima Terminal Crimps in Magway