Klima delay on make timers for Saudi Arabia
With about 33.7 million people, Saudi Arabia is a large national market in Asia. Its capital is Riyadh. The prevailing climate is hot and arid, though conditions differ between regions. Summer daytime temperatures commonly pass 40 °C, and equipment in direct sun runs far hotter than the air.
The main users of delay on make timers in Saudi Arabia are offices, shops and malls as well as factories and workshops. The Klima range includes 4 models, each with a specification table; send an enquiry from Saudi Arabia for a quotation.
- Capital
- Riyadh
- Population
- 33.7 million
- Area
- 1,960,582 km²
- Time zone
- UTC+3 all year
- Climate
- Hot and arid
- Supply
- 127/220 V, 60 Hz
- Main ports
- Jeddah Islamic Port, King Abdulaziz Port (Dammam), Jubail Commercial Port
- Standards
- SASO / SABER conformity certificates and GSO standards
Klima Delay on Make Timer models
- Klima Delay on Make Timer, Fixed, 24 V AC/DC Supply voltage: 24 V AC/DC, Delay range: 3 min fixed, Contact rating: 5 A
- Klima Delay on Make Timer, Fixed, 230 V AC Supply voltage: 230 V AC, Delay range: 3 min fixed, Contact rating: 5 A
- Klima Delay on Make Timer, Adjustable, 24 V AC/DC Supply voltage: 24 V AC/DC, Delay range: 0.1 to 10 min, Contact rating: 5 A
- Klima Delay on Make Timer, Adjustable, 230 V AC Supply voltage: 230 V AC, Delay range: 0.1 to 10 min, Contact rating: 5 A
All Klima products for Saudi Arabia · Klima Delay on Make Timer overview
Conditions in Saudi Arabia that affect delay on make timers
In Saudi Arabia, air conditioning and refrigeration run for most of the year. Outdoor units sit in direct sun, which raises component temperatures well above the air temperature; delay on make timers with generous ratings and secure terminations last longer than parts chosen to the bare nameplate value.
Dust blocks sensor openings and slows response; clean the vents of delay on make timers at each service.
Saudi Arabia uses 127/220 V at 60 Hz, so check that delay on make timers are rated for that voltage and for 60 Hz operation before you order.
Where delay on make timers are needed in Saudi Arabia
Riyadh, the capital, lies about 849 km north-east of Jeddah, which is the largest listed city, so say which of the two cities a delivery is for. From Jizan to Qurayyat, the longest straight-line gap between listed cities is about 1,690 km; which means days by road between the far ends, with air freight used for urgent parts. These are the biggest listed cities in Saudi Arabia; the last column names what to watch for in delay on make timers there.
| City | People | Climate | What wears delay on make timers first |
|---|---|---|---|
| Jeddah | 4.7 million | hot and arid | dust in enclosures and sticky switches |
| Riyadh | 4.2 million | hot and arid | sensor drift and setpoints creeping |
| Mecca | 1.6 million | hot and arid | dust in enclosures and sticky switches |
| Buraydah | 745,000 | hot and arid | dust in enclosures and sticky switches |
| Ha'il | 606,000 | hot and arid | sensor drift and setpoints creeping |
| Najran | 506,000 | hot and arid | sensor drift and setpoints creeping |
All 31 listed cities share a hot and arid climate, so one stocking plan covers the whole country.
Daylight, sun angle and time in Saudi Arabia
Riyadh keeps UTC+3 all year.
Sunlight at 24.7° N (Riyadh): about 13 h 40 min of daylight in June, about 10 h 36 min in December, and a noon sun that reaches 89° in June and 42° in December. The sun climbs almost to the zenith, so outdoor units on roofs and in open yards take the full load of its heat.
The land and the people of Saudi Arabia
At roughly 1,960,582 km², Saudi Arabia is the 14th largest of the 241 countries covered by this directory, almost exactly the size of Mexico (1,972,550 km²). With 33.7 million residents the average density is 17 per km², so Saudi Arabia counts as sparsely settled, sparser than 85% of the other countries in this directory. With long distances between sites, a call-out for a missing part is costly, so keep a small stock of the common ratings. Its population is similar to that of Uzbekistan (33 million).
Jobs in Saudi Arabia that call for delay on make timers
Typical work in Saudi Arabia that needs delay on make timers:
- Generator-backed sites with mains transfer switching
- Staggered start of several compressors after power cuts
- Chiller control panels
- Refrigerated trucks and containers
- Pump and fan motor delayed start
Klima delay on make timers models
| Model | Supply voltage (V) | Delay range | Contact rating (A) |
|---|---|---|---|
| Klima Delay on Make Timer, Fixed, 24 V AC/DC | 24 V AC/DC | 3 min fixed | 5 |
| Klima Delay on Make Timer, Fixed, 230 V AC | 230 V AC | 3 min fixed | 5 |
| Klima Delay on Make Timer, Adjustable, 24 V AC/DC | 24 V AC/DC | 0.1 to 10 min | 5 |
| Klima Delay on Make Timer, Adjustable, 230 V AC | 230 V AC | 0.1 to 10 min | 5 |
See the full Klima Delay on Make Timer range for specifications, standards and a plain-language guide to choosing the right part.
Selecting delay on make timers in Saudi Arabia
- Check the output contact rating against the contactor coil's holding and inrush current.
- Check the mounting style: plug-in socket, surface mount or panel.
- Confirm the supply first: Saudi Arabia uses 127/220 V at 60 Hz, so check the voltage and frequency rating of delay on make timers against the equipment nameplate.
- Ask for the datasheet and the documents your project needs; in Saudi Arabia that usually means SASO / SABER conformity certificates and GSO standards.
Keeping delay on make timers reliable in Saudi Arabia
- Keep the timer away from heat sources inside the panel.
Saudi Arabia lies in the northern hemisphere, where cooling demand usually peaks from May to September. Schedule inspections of delay on make timers for March or April, ahead of that peak. Calibrate and test controls under easy conditions so settings are proven before the load rises.
Faults to watch for
- No restart at all after the delay period has passed
Which standards apply to delay on make timers in Saudi Arabia
Klima delay on make timers follow IEC 61812-1 (time relays); in Saudi Arabia expect SASO / SABER conformity certificates and GSO standards as well. Request the datasheet and test documents with your enquiry so the paperwork is ready before the goods ship.
Getting delay on make timers to Saudi Arabia
Sea freight into Saudi Arabia normally clears through ports such as Jeddah Islamic Port, King Abdulaziz Port (Dammam) and Jubail Commercial Port, with onward delivery by road; urgent parts can travel by air.
The local currency is the Rial (SAR), so confirm the quotation currency and delivery terms before you order. The main languages are Arabic; this site and its enquiry form are in English.
Contractors and traders can ask for trade terms through the distributors page. See the distributors page.
Questions about delay on make timers in Saudi Arabia
Is it the same as an anti-short-cycle device?
An anti-short-cycle timer is a specific use of a delay on make timer. It prevents restarting until the minimum off-time has elapsed.
What voltage should delay on make timers be rated for in Saudi Arabia?
The mains supply in Saudi Arabia is 127/220 V, 60 Hz. Some equipment is built for other markets, so confirm the voltage and frequency printed on the nameplate and match the delay on make timer to it.
Which standards apply to delay on make timers in Saudi Arabia?
Klima delay on make timers follow IEC 61812-1 (time relays). In Saudi Arabia the local framework is SASO / SABER conformity certificates and GSO standards; request the datasheet and conformity documents with your enquiry.
How are delay on make timers delivered to Saudi Arabia?
Cargo for Saudi Arabia usually arrives through Jeddah Islamic Port, King Abdulaziz Port (Dammam) and Jubail Commercial Port; tell us your preferred port or delivery address with your enquiry.
Which cities in Saudi Arabia can I order delay on make timers for?
Every listed city is covered. The largest are Jeddah (4.7 million), Riyadh (4.2 million), Mecca (1.6 million), Medina (1.3 million) and Dammam (1.3 million). The country page lists the rest.
Do the neighbours of Saudi Arabia use the same mains supply?
No. The supply next door is different: Qatar (230 V, 50 Hz), Oman (230 V, 50 Hz), Iraq (230 V, 50 Hz) and 4 more. Check the voltage and frequency of the destination before ordering parts for use across the border.
What local time and daylight should I plan for in Saudi Arabia?
Riyadh keeps UTC+3 all year. At 24.7° N there are about 13 h 40 min of daylight in June and about 10 h 36 min in December.
More Klima products for Saudi Arabia
- Klima Contactors in Saudi Arabia
- Klima Thermostats in Saudi Arabia
- Klima Transformer for HVAC in Saudi Arabia
- Klima PVC Tapes in Saudi Arabia
- Klima Temperature Controllers in Saudi Arabia
- Klima Condensate Pump in Saudi Arabia