Buying delay on make timers in Vigo
With about 294,000 people, Vigo is a mid-sized city in Spain. Summers are warm rather than extreme and winters are cool, so heating matters as much as cooling.
Demand for delay on make timers comes mostly from offices, shops and malls, factories and workshops as well as data centres and server rooms. The Klima range includes 4 models, each with a specification table; send an enquiry from Vigo for a quotation.
- Country
- Spain
- Population
- 294,000
- Climate
- Temperate
- Coordinates
- 42.2° N, 8.7° W
- Time zone
- UTC+1, moving to UTC+2 while daylight saving applies
- From Madrid
- 465 km north-west
- Supply
- 230 V, 50 Hz
Klima Delay on Make Timer models
- Klima Delay on Make Timer, Fixed, 24 V AC/DC Supply voltage: 24 V AC/DC, Delay range: 3 min fixed, Contact rating: 5 A
- Klima Delay on Make Timer, Fixed, 230 V AC Supply voltage: 230 V AC, Delay range: 3 min fixed, Contact rating: 5 A
- Klima Delay on Make Timer, Adjustable, 24 V AC/DC Supply voltage: 24 V AC/DC, Delay range: 0.1 to 10 min, Contact rating: 5 A
- Klima Delay on Make Timer, Adjustable, 230 V AC Supply voltage: 230 V AC, Delay range: 0.1 to 10 min, Contact rating: 5 A
All Klima products for Vigo · Klima Delay on Make Timer overview
What Vigo demands of delay on make timers
In Vigo, cooling demand is seasonal, with short hot spells that stress equipment. Daily heating and cooling cycles work screwed and crimped connections loose over time; check the torque on the terminals of delay on make timers at least once a year.
Damp air attacks exposed contacts and boards; fit delay on make timers in enclosures that keep moisture out, and check the seals at each service.
Cities around Vigo that need delay on make timers
Vigo ranks 14th of the 35 listed cities in Spain and holds about 2% of the people living in them, about 9% of the size of Madrid, the largest. Vigo lies about 465 km north-west of Madrid, the capital. It is about the same size as Banjarbaru in Indonesia, which has 293,000.
Nearest to Vigo: A Coruna (129 km north), Oviedo (266 km north-east) and Gijon (288 km north-east). No other listed city lies within 100 km, and three lie within 300 km.
| City | Distance | People | What wears delay on make timers first |
|---|---|---|---|
| A Coruna | 129 km north | 250,000 | condensation inside enclosures |
| Oviedo | 266 km north-east | 220,000 | condensation inside enclosures |
| Gijon | 288 km north-east | 272,000 | condensation inside enclosures |
| Valladolid | 337 km east | 301,000 | calibration drift between seasons |
| Burgos | 413 km east | 176,000 | calibration drift between seasons |
| Santander | 424 km east | 174,000 | condensation inside enclosures |
In a mid-sized city like Vigo, specific control ranges can be hard to find. Send the model or nameplate and the range you need so the right one is matched.
Time zone, sun and daylight in Vigo
The clock in Vigo follows UTC+1, moving to UTC+2 while daylight saving applies.
At 42.2° N, Vigo has about 15 h 16 min of daylight at the June solstice and about 9 h 05 min at the December solstice. The noon sun stands 71° above the horizon in June and 24° in December, and the sun climbs high in summer, so shade and ventilation around outdoor units matter. Unlike the Mediterranean country as a whole, Vigo is temperate; 7 other listed cities share it.
Jobs in Vigo that call for delay on make timers
In Vigo, these are the jobs that most often call for delay on make timers:
- Chiller control panels
- Staggered start of several compressors after power cuts
- Rooftop packaged units
Klima delay on make timers models
| Model | Supply voltage (V) | Delay range | Contact rating (A) |
|---|---|---|---|
| Klima Delay on Make Timer, Fixed, 24 V AC/DC | 24 V AC/DC | 3 min fixed | 5 |
| Klima Delay on Make Timer, Fixed, 230 V AC | 230 V AC | 3 min fixed | 5 |
| Klima Delay on Make Timer, Adjustable, 24 V AC/DC | 24 V AC/DC | 0.1 to 10 min | 5 |
| Klima Delay on Make Timer, Adjustable, 230 V AC | 230 V AC | 0.1 to 10 min | 5 |
See the full Klima Delay on Make Timer range for specifications, standards and a plain-language guide to choosing the right part.
How to pick delay on make timers for work in Vigo
- Check the mounting style: plug-in socket, surface mount or panel.
- Confirm the supply first: Spain uses 230 V at 50 Hz, so check the voltage and frequency rating of delay on make timers against the equipment nameplate.
Keeping delay on make timers reliable in Vigo
- Replace the timer if the delay drifts or fails to latch.
In the northern hemisphere the busiest cooling months fall in July and August; May or June is a sensible time to check delay on make timers in Vigo. Calibrate and test controls under easy conditions so settings are proven before the load rises.
Signs of trouble
- A compressor that restarts immediately after switching off
Supply and delivery to Vigo
Shipments for Vigo normally clear customs at one of the main entry points of Spain and finish the journey by road; send your delivery address with the enquiry.
National rules, standards and voltage for Spain are summarised on the country page.
Contractors and traders can ask for trade terms through the distributors page. See the distributors page.
Delay on make timers in Vigo: common questions
Can one timer protect several compressors?
Usually each compressor circuit needs its own delay. One timer can sequence several only if its output rating and logic are designed for that.
What voltage should delay on make timers be rated for in Vigo?
Spain supplies 230 V at 50 Hz, the common 230/400 V, 50 Hz pattern, so delay on make timers rated for 230 V single-phase and 400 V three-phase equipment are the usual choice.
How are delay on make timers delivered to Vigo?
To order delay on make timers for Vigo, give a delivery address or a collection point in your enquiry, and mention whether road, sea or air delivery suits the job.
Which parts of Vigo can I order for?
Enquiries are welcome from every part of Vigo. Send the delivery address with your enquiry.
Which cities near Vigo can the same order serve?
The listed cities closest to Vigo are A Coruna (129 km north), Oviedo (266 km north-east) and Gijon (288 km north-east). Combine them into one order and give each delivery address.
What local time and daylight should I plan for in Vigo?
Vigo keeps UTC+1, moving to UTC+2 while daylight saving applies. At 42.2° N there are about 15 h 16 min of daylight in June and about 9 h 05 min in December.
More Klima products for Vigo
- Klima Contactors in Vigo
- Klima Thermostats in Vigo
- Klima Transformer for HVAC in Vigo
- Klima Capacitors in Vigo
- Klima Temperature Controllers in Vigo
- Klima Filter Driers in Vigo