Klima Industries

Cables supply in Egypt

With about 98.4 million people, Egypt is a large national market in Africa. Its capital is Cairo. The prevailing climate is hot and arid, though conditions differ between regions. Summer daytime temperatures commonly pass 40 °C, and equipment in direct sun runs far hotter than the air.

Demand for cables comes mostly from offices, shops and malls, factories and workshops as well as homes and apartments. The range below has 6 models; send an enquiry with the model code and your delivery address in Egypt.

Capital
Cairo
Population
98.4 million
Area
1,001,450 km²
Time zone
UTC+2, moving to UTC+3 while daylight saving applies
Climate
Hot and arid
Supply
230 V, 50 Hz
Main ports
Alexandria Port, Port Said, Damietta Port, Sokhna Port
Standards
EOS (Egyptian Organization for Standardization) conformity

Klima Cables (3 & 4 Core) models

All Klima products for Egypt · Klima Cables (3 & 4 Core) overview

Conditions in Egypt that affect cables

In Egypt, air conditioning and refrigeration run for most of the year. Outdoor units sit in direct sun, which raises component temperatures well above the air temperature; cables with generous ratings and secure terminations last longer than parts chosen to the bare nameplate value.

Dust and sand work their way into outdoor control boxes; closed covers, intact gaskets and regular cleaning keep cables cooler and connections reliable.

The mains supply in Egypt is 230 V, 50 Hz. Match cables to that voltage class and confirm whether the equipment is single-phase or three-phase before you order.

Mapping demand for cables in Egypt

From Aswan to Marsa Matruh, the longest straight-line gap between listed cities is about 981 km; so delivery to the far end of the country is a long road journey. Cairo is both the capital and the largest listed city, with about 9.6 million people, so the capital is also the biggest single market. These are the biggest listed cities in Egypt; the last column names what to watch for in cables there.

CityPeopleClimateWhat wears cables first
Cairo9.6 millionhot and aridterminals loosening and parts running hot
Alexandria5.3 millionhot and aridterminals loosening and parts running hot
Giza4.4 millionhot and ariddust on contacts and blocked cooling
Al Mansurah622,000hot and ariddust on contacts and blocked cooling
Al Mahallah al Kubra593,000hot and ariddust on contacts and blocked cooling
Al Fayyum519,000hot and aridterminals loosening and parts running hot

Mains supply across the borders of Egypt

Across the border, Libya, Sudan, Israel and Palestine also run on a nominal 230 V at 50 Hz, so ratings carry over between Egypt and its neighbours; the nameplate of the equipment still decides.

Egypt in numbers

Egypt covers about 1,001,450 km², the 30th largest of the 241 countries in this directory, a little smaller than Mauritania (1,030,700 km²). About 98.4 million people live there, an average of 98 people per km², which makes it moderately settled, close to the middle of the directory for density. People and businesses cluster around the main cities, so say which city or region the delivery is for. In population it sits close to Vietnam, which has about 95.5 million.

Typical uses of cables in Egypt

In Egypt, these are the jobs that most often call for cables:

  • Building refurbishment and retrofit work
  • Fan coil unit and VRF branch wiring
  • Pump, fan and compressor motor connections
  • Control panels and sub-distribution boards
  • Power supply to packaged and ducted units

Klima cables models

ModelCoresConductor size (mm²)Insulation
Klima 3-Core Flexible Cable 1.5 mm²31.5PVC
Klima 3-Core Flexible Cable 2.5 mm²32.5PVC
Klima 3-Core Flexible Cable 4 mm²34PVC
Klima 4-Core Flexible Cable 1.5 mm²41.5PVC
Klima 4-Core Flexible Cable 2.5 mm²42.5PVC
Klima 4-Core Flexible Cable 4 mm²44PVC

See the full Klima Cables (3 & 4 Core) range for specifications, standards and a plain-language guide to choosing the right part.

Choosing cables for Egypt

  • Choose the insulation class for the route. Outdoor runs exposed to sunlight need UV-resistant sheathing or conduit protection.
  • Use 4-core where the unit needs a communication or switched conductor, and 3-core for simple live-neutral-earth feeds.
  • Confirm the supply first: Egypt uses 230 V at 50 Hz, so check the voltage and frequency rating of cables against the equipment nameplate.
  • Ask for the datasheet and the documents your project needs; in Egypt that usually means EOS (Egyptian Organization for Standardization) conformity.

Care and maintenance in Egypt

  • Protect cable where it passes through walls and metal edges with grommets or sleeves.

Egypt lies in the northern hemisphere, where cooling demand usually peaks from May to September. Schedule inspections of cables for March or April, ahead of that peak. Electrical parts fail most often when the load is highest, so retighten and test before the peak.

Faults to watch for

  • Warm cable or terminals under load

Standards and paperwork for cables in Egypt

Two sets of rules apply to cables sold into Egypt: the product standard, IEC 60227 and IEC 60245 (insulated flexible cables), and the local one, EOS (Egyptian Organization for Standardization) conformity. Importers and consultants normally ask for datasheets and test documents, so request them with the enquiry.

Ordering cables for Egypt

Sea freight into Egypt normally clears through ports such as Alexandria Port, Port Said, Damietta Port and Sokhna Port, with onward delivery by road; urgent parts can travel by air.

The local currency is the Pound (EGP), so confirm the quotation currency and delivery terms before you order. The main languages are Arabic, English and French; this site and its enquiry form are in English.

Contractors and traders can ask for trade terms through the distributors page. See the distributors page.

Questions about cables in Egypt

What is the difference between 3-core and 4-core cable?

3-core cable normally carries live, neutral and earth. 4-core adds a fourth conductor for communication or a switched supply, or carries three live phases plus earth on small three-phase equipment.

What voltage should cables be rated for in Egypt?

With a 230 V, 50 Hz supply, Egypt follows the standard 230/400 V, 50 Hz arrangement; check the rated voltage on every cable against the equipment it serves.

Which standards apply to cables in Egypt?

Klima cables follow IEC 60227 and IEC 60245 (insulated flexible cables). In Egypt the local framework is EOS (Egyptian Organization for Standardization) conformity; request the datasheet and conformity documents with your enquiry.

How are cables delivered to Egypt?

Cargo for Egypt usually arrives through Alexandria Port, Port Said, Damietta Port and Sokhna Port; tell us your preferred port or delivery address with your enquiry.

Which cities in Egypt can I order cables for?

Every listed city is covered. The largest are Cairo (9.6 million), Alexandria (5.3 million), Giza (4.4 million), Port Said (781,000) and Suez (700,000). The country page lists the rest.

Do the neighbours of Egypt use the same mains supply?

Yes. All 4 listed neighbours (Libya, Sudan, Israel and Palestine) run on a nominal 230 V at 50 Hz, the same as Egypt, so the electrical rating of a part does not usually change at the border.

What local time and daylight should I plan for in Egypt?

Cairo keeps UTC+2, moving to UTC+3 while daylight saving applies. At 30.1° N there are about 14 h 05 min of daylight in June and about 10 h 12 min in December.

More Klima products for Egypt

Cables in cities across Egypt