Ireland: Klima Contactors
With about 4.9 million people, Ireland is a smaller national market in Europe. Its capital is Dublin. The prevailing climate is temperate, though conditions differ between regions. Summers are warm rather than extreme and winters are cool, so heating matters as much as cooling.
Contactors are bought here mainly for offices, shops and malls, homes and apartments as well as hospitals and clinics. The Klima range includes 7 models, each with a specification table; send an enquiry from Ireland for a quotation.
- Capital
- Dublin
- Population
- 4.9 million
- Area
- 70,280 km²
- Time zone
- UTC+0, moving to UTC+1 while daylight saving applies
- Climate
- Temperate
- Supply
- 230 V, 50 Hz
- Main ports
- Dublin Port, Cork
- Standards
- CE marking, RoHS and, where relevant, the Pressure Equipment Directive (PED) and F-gas regulations
Klima Contactors models
- Klima 2-Pole Contactor 25 A, 24 V Coil Poles: 2, Rated current: 25 A, Coil voltage: 24 V AC
- Klima 2-Pole Contactor 25 A, 230 V Coil Poles: 2, Rated current: 25 A, Coil voltage: 230 V AC
- Klima 3-Pole Contactor 25 A, 24 V Coil Poles: 3, Rated current: 25 A, Coil voltage: 24 V AC
- Klima 3-Pole Contactor 32 A, 24 V Coil Poles: 3, Rated current: 32 A, Coil voltage: 24 V AC
- Klima 3-Pole Contactor 32 A, 230 V Coil Poles: 3, Rated current: 32 A, Coil voltage: 230 V AC
- Klima 3-Pole Contactor 40 A, 230 V Coil Poles: 3, Rated current: 40 A, Coil voltage: 230 V AC
- Klima 3-Pole Contactor 63 A, 230 V Coil Poles: 3, Rated current: 63 A, Coil voltage: 230 V AC
All Klima products for Ireland · Klima Contactors overview
Contactors and the climate in Ireland
In Ireland, cooling demand is seasonal, with short hot spells that stress equipment. Daily heating and cooling cycles work screwed and crimped connections loose over time; check the torque on the terminals of contactors at least once a year.
High humidity brings condensation and terminal corrosion, so favour insulated, well-sealed contactors and keep control boxes closed with their gaskets intact.
Ireland supplies 230 V at 50 Hz, the common 230/400 V, 50 Hz pattern, so contactors rated for 230 V single-phase and 400 V three-phase equipment are the usual choice.
Mapping demand for contactors in Ireland
The capital, Dublin, is also the largest listed city (about 1 million people), which keeps most large buyers in one place. About 74% of the people in listed cities live in Dublin, Cork and Limerick; a few centres do most of the buying. These are the biggest listed cities in Ireland; the last column names what to watch for in contactors there.
| City | People | Climate | What wears contactors first |
|---|---|---|---|
| Dublin | 1 million | temperate | moisture on terminals and corrosion |
| Cork | 224,000 | temperate | expansion and contraction loosening joints |
| Limerick | 102,000 | temperate | moisture on terminals and corrosion |
| Galway | 86,000 | temperate | expansion and contraction loosening joints |
| Navan | 34,000 | temperate | expansion and contraction loosening joints |
| Ennis | 28,000 | temperate | expansion and contraction loosening joints |
Every one of the 17 listed cities has a temperate climate, which keeps the choice of parts consistent from city to city.
Size and settlement in Ireland
Ireland covers about 70,280 km², the 121st smallest of the 241 countries in this directory, almost exactly the size of Georgia (69,700 km²). Its 4.9 million people give an average of 69 per km². In this directory that is moderately settled, sparser than 58% of the other countries in this directory. People and businesses cluster around the main cities, so say which city or region the delivery is for. In population it sits close to Oman, which has about 4.8 million.
The sun and the clock in Ireland
The clock in Dublin follows UTC+0, moving to UTC+1 while daylight saving applies.
Sunlight at 53.3° N (Dublin): about 17 h 00 min of daylight in June, about 7 h 30 min in December, and a noon sun that reaches 60° in June and 13° in December. The sun climbs high in summer, so shade and ventilation around outdoor units matter.
Jobs in Ireland that call for contactors
Typical work in Ireland that needs contactors:
- Chiller and air handling unit starter panels
- Compressor control in split and packaged air conditioners
- Walk-in cold rooms and refrigerated display cases
- Heat pump defrost and reversing controls
- Heater banks and electric reheat
Klima contactors models
| Model | Poles | Rated current (A) | Coil voltage (V) |
|---|---|---|---|
| Klima 2-Pole Contactor 25 A, 24 V Coil | 2 | 25 | 24 V AC |
| Klima 2-Pole Contactor 25 A, 230 V Coil | 2 | 25 | 230 V AC |
| Klima 3-Pole Contactor 25 A, 24 V Coil | 3 | 25 | 24 V AC |
| Klima 3-Pole Contactor 32 A, 24 V Coil | 3 | 32 | 24 V AC |
| Klima 3-Pole Contactor 32 A, 230 V Coil | 3 | 32 | 230 V AC |
| Klima 3-Pole Contactor 40 A, 230 V Coil | 3 | 40 | 230 V AC |
See the full Klima Contactors range for specifications, standards and a plain-language guide to choosing the right part.
Choosing contactors for Ireland
- Size by motor current, not by horsepower alone. Use the compressor nameplate RLA and LRA, and choose a contactor with a rated operating current above them.
- Pick the right pole count: 2-pole for single-phase units where both lines must break, 3-pole for three-phase compressors.
- Confirm the supply first: Ireland uses 230 V at 50 Hz, so check the voltage and frequency rating of contactors against the equipment nameplate.
- Ask for the datasheet and the documents your project needs; in Ireland that usually means CE marking, RoHS and, where relevant, the Pressure Equipment Directive (PED) and F-gas regulations.
Keeping contactors reliable in Ireland
- Tighten power terminals to the torque on the datasheet; loose lugs cause heat and buzzing.
Ireland lies in the northern hemisphere, where cooling demand usually peaks in July and August. Schedule inspections of contactors for May or June, ahead of that peak. A failed electrical part in the peak weeks means a day without cooling, so replace weak ones early.
Signs of trouble
- Burnt or welded contacts that keep the unit running when switched off
Approvals for contactors sold into Ireland
Two sets of rules apply to contactors sold into Ireland: the product standard, IEC 60947-4-1 (contactors and motor-starters), and the local one, CE marking, RoHS and, where relevant, the Pressure Equipment Directive (PED) and F-gas regulations. Importers and consultants normally ask for datasheets and test documents, so request them with the enquiry.
Supply and delivery to Ireland
Sea freight into Ireland normally clears through ports such as Dublin Port and Cork, with onward delivery by road; urgent parts can travel by air.
The local currency is the Euro (EUR), so confirm the quotation currency and delivery terms before you order. The main languages are English and Irish; this site and its enquiry form are in English.
Wholesalers and installers who buy regularly can ask about trade terms. See the distributors page.
Questions about contactors in Ireland
How often should contactors be replaced?
There is no fixed interval. Replace them when the contacts show pitting or heat discolouration, or at the first sign of intermittent starting. Frequent cycling shortens life.
What voltage should contactors be rated for in Ireland?
The mains supply in Ireland is 230 V, 50 Hz. Match contactors to that voltage class and confirm whether the equipment is single-phase or three-phase before you order.
Which standards apply to contactors in Ireland?
Klima contactors follow IEC 60947-4-1 (contactors and motor-starters). In Ireland the local framework is CE marking, RoHS and, where relevant, the Pressure Equipment Directive (PED) and F-gas regulations; request the datasheet and conformity documents with your enquiry.
How are contactors delivered to Ireland?
Cargo for Ireland usually arrives through Dublin Port and Cork; tell us your preferred port or delivery address with your enquiry.
Which cities in Ireland can I order contactors for?
Every listed city is covered. The largest are Dublin (1 million), Cork (224,000), Limerick (102,000), Galway (86,000) and Waterford (60,000). The country page lists the rest.
What local time and daylight should I plan for in Ireland?
Dublin keeps UTC+0, moving to UTC+1 while daylight saving applies. At 53.3° N there are about 17 h 00 min of daylight in June and about 7 h 30 min in December.
Do the neighbours of Ireland use the same mains supply?
Yes. Its only listed neighbour (the United Kingdom) runs on a nominal 230 V at 50 Hz, the same as Ireland, so the electrical rating of a part does not usually change at the border.
More Klima products for Ireland
- Klima Capacitors in Ireland
- Klima Delay on Make Timer in Ireland
- Klima Transformer for HVAC in Ireland
- Klima Thermostat Guards in Ireland
- Klima Condensate Pump in Ireland
- Klima Cables (3 & 4 Core) in Ireland